Components of Electrical system (AC and DC)
AC:
DC:
AVAIL light on GPU button
AC GPU is connected to the airplane and AC power quality requirements (voltage/amperage/frequency) are satisfied
Amber dashes on Electrical synoptic page
output is invalid or out of range
Output rating of IDGs and APU Gern
When are IDGs automatically disconnected?
- the IDG oil temperature reaches 366°F (185.6°C)
Output rating of Ram Air Turning
15 kVA
115 VAC
400 Hz
3- phase
Speed required to ensure RAT supplies AC/DC ESS Buses
130 knts
How long for RAT deployment
8 secs
*Batts supply backup power to DC ESS and STANDBY AC during rat deployment
Output of TRUs
TRUs provide DC power to which busses?
TRU 1 —> DC BUS 1, DC ESS BUS 1, DC GND SVC BUS, HOT BATT BUS 1 and battery #1 charging
TRU 2 —> DC BUS 2, DC ESS BUS 2, HOT BATT BUS 2 and battery #2 charging
TRU ESS —> DC ESS BUS 3
Output of Nicad batteries
Components of electrical power distribution and control
Electrical Bus locations
LICC - AC BUS 1, AC GND SVC BUS, DC GND SVC BUS, DC BUS 1
RICC - AC BUS 2, DC BUS 2, DC ESS BUS 2
EICC - AC ESS BUS, STBY AC BUS, DC ESS BUS 1, DC ESS BUS 3, HOT BATT BUS 1
AICC - HOT BATT BUS 2, APU START BUS
Which buses power the SPDAs
SPDA 1 - DC BUS 1 , DC ESS BUS 1, DC ESS BUS 2, DC GND SVC BUS
SPDA 2 - DC BUS 2, DC ESS BUS 1, DC ESS BUS 2, DC GND SVC BUS
Which CBs can be monitored by the flight crew
- Electronic remote CBs located inside the SPDAs
Electrical source priority
– Respective IDG.
– APU generator.
– GPU (on ground without APU).
– Opposite IDG
Which components are commanded off by SPDA during load shedding
– Galleys and;
– Right windshield heating.
How long can the batteries supply electrical power
10 mins
IDG OIL message
- High Oil Temp
Which busses does the RAT power when deployed?
Via ESS TR: