Preliminary Pre-Flight (17)
Before Start (8)
Pushback or Towing Procedure (2)
When pushback complete, tow-bar disconnected, and nose gear steering lockout pin is removed:
Engine Start Procedure (4)
Prior to starter cutout -
Monitor fuel flow & EGT
After Starter Cutout -
Call “Starter cutout”
Monitor N1 ,N2, EGT, FF, & Oil pressure
At 56% N2 if engine start switch doesn’t return automatically to AUTO/OFF move it to AUTO/OFF
Start Valve Open alert extinguishes
Before Taxi (13)
Before Takeoff (3)
After Takeoff (5)
Descent (8)
After Landing (8)
Shutdown (16)
Secure (4)