What is Navy’s Mission
To prepare naval power in order to enable the integrated force in competition and conflict
How long do you keep the issue of authorisation form for?
Seven years
How often is a FAT trial
The Frequency Accuracy Trial remains valid for 5 years
What are the likelihood parameters used in preparing a HRA
Rare
Improbable
Occasional
Probable
Almost Certain
What are the triggers for a new DMA Cycle
Crew being alongside for 90 - 120 days
30% crew change in between 90-120 days and a 50% command team change between 90-120 days
What are the WEE specific requirements for WE departmental duties
What does a DMA achieve
The outcome of the DMA is evidence that departments individually are effectively managed and maximise likelihood achieving sea release
What form is used to grant authorisations
Issue of authorisation form, normally includes justification that the member is competent
What is a DMA?
A DMA is an assurance procedure accesses People and Process IAW AFGO 302
What is a FAT
A frequency accuracy trial is to access the accuracy of through-air transmissions
What is a short cast
The XO will issue temporary orders titled short cast and will forecast the following week
What is a SWMA
A swMA provides a mechanism with a repeatable and suitable process for assessing the material state of a system. (Seaworthiness Material Assessment)
What is a TH118
TH118 is the Hull structural Maintenance certification
What is a TM194
Planned Maintenance Deficiency Report
What is direct supervision
Supervision which requires constant intervention
What is DMA
Departmental Management Audit
What is EDMAT
DMA generates OQE which receives and stored the data.
What is engineering authority
An individual who is assigned engineering authority is delegated authority to make technical decisions or provide advice concerning ADF maritime materiel
What is ERUS
ERUS is Engineering Ready Use Stores. The holdings of ERUS is discouraged - however during deployments ERUS can be approved - must be visible for CASMAT routines
What is Executive Authority
Executive Authority, in the context of materiel engineering and maintenance, to refer to an individual with authority to authorise the design, procurement, modification, maintenance and use of materiel, and the commitment of enabling resources.
What is FTA(H)
The FTA Harbour Phase is an assessment of engineering plant and personnel. It provides an extensive Class-specific assessment on the material condition of systems, equipment, and compartments and functional performance of equipment and systems that can be operated in harbour. The SwMA and Harbour Acceptance Trial (HAT) procedures are used to evaluate each DE. It additionally evaluates competencies of qualified engineering watch keeping personnel through review and examination.
What is limited supervision
Occurs when work is carried out with little face-to-face supervision or intervention
What is routine supervision
Occurs when work is carried out with minimal intervention from the supervisor
What is the basin trial
The basin trial is a class specific assessment that includes the operation of the entire marine engineering plant to evaluate if it can be safely operated in harbour.