What is the order of Nozzle dam installation?
What must be done before the last nozzle dam is installed?
last nozzle dam installed must be a HOT LEG (ensures hot leg vent path always available)
When must Containment Closure be established?
when must Containment Closure Capability be establised?
closure
capability
What is level vessel is not allowed to exceed once the head is detensioned?
Why?
114’ (vessel flange)
if level touches flange o-ring cleanliness is compromised and MM must be contacted to evaluate