Who should be included in intra-office and inter-team communications?
A/E, Consultants, Drafters, Modelers, Specifier
Preliminary Coordination effort should involve coordinating information where?
What should be reviewed/corrected at Final Coordination?
What can be used to create a Project Coordination Checklist?
PPD, Outline Spec, or Office checklist
What is the purpose of a Project Coordination Checklist?
Why should consistent terms and abbreviations be enforced?
Avoids confusion, higher construction costs, delays and faulty construction
What is the precedence between drawings and specifications?
A precedence SHOULD NOT be established in contract documents. They are COMPLEMENTARY
How are conflicts addressed between drawings and specifications?
A/E makes a documented interpretation
What is required to identify owner’s project requirements?
Owner developed project scope, project budget and project schedule
Why does A/E need fully defined owner’s requirements?
Influence size, arrangement, systems, sub-systems, and components
How does the project team select products/systems that meet owner’s requirements? What should be reviewed?
Regular review between specifier and design team to ensure quality
- Discuss project manual preparation
- Product decisions
- Detail review
- Coordinate terminology
What are common methods for coordinating specification information between the project team?
What can the specifier do to ensure the project manual address all project requirements?
What efforts are made by A/E to coordinate design with project manual?
Who coordinates consultant information for the project manual? What information does the consultant need to start?
A/E assumes responsibility for overall coordination. Information to be shared w/ consultants before starting:
- Type of project
- Contract
- Spec format
- General conditions
- Div. 01 requirements
What owner information is coordinated in the project manual?
How does Division 00 include procedures for soliciting pricing for a project?
00 10 00 - Solicitation: instructions may contain guidance for preparing alternate bids or proposals, and considerations for evaluation and contract award
How does Division 00 include contractual requirements for a project?
00 31 00 - Available Project Information: owner provided reports, agreement forms after review of contract and conditions of contract
How should discrepancies be identified between Division 00 and specification sections?
How should Division 01 sections be revised to conform with procurement requirements?
Who evaluates product and material compatibility and why?
Specifier - incompatibilities not discovered before construction can result in latent defects
Who evaluates product and materials in tested assemblies and why?
Specifier - ensures products/materials are listed in test, deviations are generally NOT permitted
Who evaluates product and materials with prescriptive codes and why?
Specifier - prescriptive code requirements are mandatory, i.e. fire resistance
How should consultants include general requirements in the construction documents?