What are the two types of information needed to begin writing spec sections?
What are sources of specific PROJECT requirements/info needed to begin writing spec sections?
What are sources of PRODUCT reference material info needed to begin writing spec sections?
What are common methods of assembling and recording specification information?
How can a full-length or shortform MASTER GUIDE SPECS be converted into outline specs?
What is streamlining in reference to specification text?
Writing in the imperative mood, subject first: keywords for quick reference
i.e. Adhesive: Spread with notched trowel
How is construction information in UniFormat converted to MasterFormat?
Uniformat provides cross-references to Masterformat Level 1 and Level 2 numbers
What are the 4 methods of specifying?
What is the Descriptive method of specifying?
Specifying properties of materials and methods of installation without proprietary names
What is the Performance method of specifying?
Specifying required results, criteria for measuring, and method to verify end result
What is the Reference Standard method of specifying?
Specifying products or processes by established industry-accepted standards (include name of org, number of standard, title, date of issue, applicable requirement)
What is the Proprietary method of specifying?
Specifying products by manufacturer’s name, brand, model, type or product characteristics *Restrictive type of specifying
Who does the developing of the specifications into written form at different size firms?
What is the process for developing specs by extracting info of project design in drawings?
Products are:
- Researched
- Selected
- Evaluated
- Coordinated w/ other products
- Specified
- Coordinated with drawings
What is the importance of complementary drawings and specifications?
Specifications are legally enforceable contract documents
What procurement and contracting requirements should be complied into project manual?
Procurement - solicitation, instructions for procurement, available information, procurement forms and supplements
Contracting - contract forms, project forms, conditions of contract, revisions/clarifications/modifications
(Tower of Power)
What is a submittal?
Document demonstrating how the Contractor proposes to conform *NOT A CONTRACT DOCUMENT
What are common quality assurance submittals?
What are common quality control submittals?
What are common closeout submittals?
How is submittal information coordinated between Div. 01 and Div. 02 - 49
Div. 01 - common requirements and typical procedures
Div. 02 - 49 - specific requirements for that section in Part 1 - General
Where are preparation requirements organized in specification sections?
Part 3 - Execution - examination and preparation
What is the purpose of including preparation requirements in specification sections?
Quality assurance measure for required actions to ensure the site/area is ready to receive work
Where are preparation requirements coordinated in Division 01?
01 71 00 - Examination and Preparation - details procedures for inspecting and verifying conditions
Includes surveying, acceptance of conditions, protection of adjacent construction