What must be done for each of the action levels?
Action Level 1:
Monitoring
Notifications
Action Level 2:
MAB Walkdowns
Monitoring
Notifications
Off Hours notification for Duty Ops Manager
Action Level 3:
MAB / RCB Walkdowns
Monitoring
HP Surveys / SG Samples
Notifications
Off Hours notification for everyone
Who performs the necessary notifications for 0PGP-ZO-0046 RCS Leakage Monitoring?
Shift Manager
When can RCS Leakage action levels be exited?
Enhanced Unidentified Leak Rate Program indicates exit from the Action Level
Entry into Mode 5
Directed the procedure.

What puts you in action level 2 for primary to secondary leakage?
Monitor CARS / BD every 10 min and N-16 every 15 mins.
If > 75 gpm for ≥ 1 hr:
What puts you in action level 1 for primary to secondary leakage?
Monitor CARS / BD every 10 mins and N-16 every 15 mins
What puts you in action level 3 for primary to secondary leakage?
Leakage from 1 S/G:
What puts you in increased monitoring for primary to secondary leakage?
Monitor CARS / BD / N-16 every 12 hrs
Note:
≤ 10% rise in 24 hrs, return to normal monitoring.
What is the definition of the Rx Coolant System Boundary (RCSB)?
Pressure containing components of the RCS including:
OCIVs
RCS Safeties
RCS PORVs
What are the action levels for unidentified leakage?
Absolute Leak Rate:
Baseline Deviation:

What are the action levels for identified leakage?

What should be done if a RCS leakage calculation was performed the test results are suspect?
Redo the Test
If the 2nd test confirms the 1st test’s results, then the action level entry time shall be the time of the 1st test’s results.
When is Form 1 (Leakage Log) entered?

When are the N-16 monitors available to detect primary-to-secondary leakage?
>25% power
Who’s approval is required to perform a field change to a procedure?
Any SRO