What is the minimum shift complement?
SM (2)
US (2)
STA (1)
RO (4)
ENS Communicator (1)
Safe S/D Plant Operators (4)
State / County Communicator (1)
When multiple alarms are received (≥ 3) due to a plant transient, normal alarm response is suspended. When is it reinstated?
US / SM using a crew update
When performing a controlled shutdown for a LCO action statement, how long does it take to shutdown the plant?
Should start shutting down as soon as you know you will not be able to fix the problem.
Note:
Adjusted to coincide with Tech Spec action times.
When must you notify the FAA that the aviation lights are not working?
Lights not working for > 30 mins
When should outdoor cranes be secured?
Wind Speeds > 30 mph
Who may authorize adding, omitting, or changing a step in a procedure?
Shift Manager
Changes are allowed as long as:
Note:
Cannot be used to fix broken procedure.
Operability calls based on chemistry samples should be made after a backup sample is taken. When does the LCO clock begin if deemed inoperable?
Starts when initial sample was taken
When is indirect IV used?
ALARA (10 mRem)
Safety Condition
Emergency Conditions
When should peer checks be used?
Risk important actions of medium risk procedures
Supervision cannot perform peer checks.
Note:
Peer checks not required for POP04s and POP05s.
When conditions make an alarm expected?
Caused By:
Current Operations
Surveillances
Testing
Known Issues
Maintenance
Direct Operator Actions