What is the purpose of 0PSP03-XC-0002 Initial Containment Inspection to Establish Integrity?
Verify 48” containment purge valves closed
Verify 18” Supplementary purge valves open/closed
Who can perform the initial containment inspection to establish integrity?
SRO
What is the max occupancy of containment during normal operations?
Normal Operations is MODE 1 - 4 (Doors normally closed) or MODE 5 with the doors closed
Who can perform all sections of this surveillance with exception of closing out the surveillance?
Non-Licensed work control SRO
Who determines what tools, test equipment, or other material may be left inside the RCB once personnel exit containment with integrity established?
SM / Unit Supervisor
If a Øa occurs while personnel are in containment, where should personnel evacuate?
Aux Air Lock
If Aux Air Lock unavailable, must reset Øa and open the PAL OCIV. Personnel can then exit via the PAL.
While checking the position of a normally locked closed valve, the valve operator cannot be moved due to the locking device. What is the proper method for checking the position of this valve?
Remove the locking device
Check valve in closed direction
When is Independent Verification NOT required?
Changing position does not render component incapable of performing it’s safety function
How is a locked throttle valve’s position verified?
Visual Observation
Local Indicators
SM’s permission required to move locked throttle valve.
When are valves in the AFWST pit required to be checked?
If security barrier is breached
Following an outage, whose permission is needed to waive the initial valve lineup for a system?
Unit’s Operation Manager
One of the following conditions must exist:
Note:
Valves in MAB pit rooms not required to be checked for initial valve lineups
If multiple channels are not available for a channel check, what must be done?
Compare indicated value with data obtained from previous log
Channel check compares channel’s indication with other indications monitoring the same parameter.
Who reviews the safety function checklist?
Unit Supervisor
On-coming RO completes the safety function checklist
How far back in the logs should the on-coming watchstanders review?
Whichever is less:
Since last watch
OR
Prior 72 hrs
Who ensures appropriate entries are made in the control room logbook?
Unit Supervisor
Who approves the use of temporary logs?
Unit Supervisor
OR
Shift Manager
If ECW supply temperature is < 75 ˚F and temperature lowers by ≥ 4 ˚F between consecutive log readings, what must the operator do?
Start all ECW pumps
What leakage rate would force the you to declare the containment sump level / flow monitoring system inoperable?
> 4.7 gpm
If AFD alarm has been inoperable for > 24 hrs, how often must AFD be logged?
Every 30 mins