WHICH one of the following actions correctly addresses the existing symptoms?
A. Stop feeding SG #1 and ensure feedwater flow is restoring level in SG #2.
B. Throttle and balance flow to each steam generator.
C. Stop feeding SG #1 and allow SG #2 to feed in RTO.
D. Allow maximum flow to SG #1 until level is greater than 10% WR.
A. Stop feeding SG #1 and ensure feedwater flow is restoring level in SG #2.
Based on these conditions, the operator should…
A. throttle HPSI immediately.
B. maximize feedflow to SG 1 and throttle HPSI when PZR level reaches 15%.
C. throttle HPSI when PZR level reaches 15%.
D. maximize feedflow to SG 1.
C. throttle HPSI when PZR level reaches 15%.
The following indications are available to the Secondary Operator: •Loop 1 T-cold 392°F •Loop 1 T-hot 480°F •Loop 2 T-cold 460°F •Loop 2 T-hot 488°F
Which one of the following pressures indicates the pressure that SG # 2 should be reduced to?
A. 465 psia.
B. 225 psia.
C. 610 psia.
D. 565 psia.
B. 225 psia.
The most likely diagnosis for this condition is:
A. ESD
B. LOCA
C. LOOP
D. SGTR
A. ESD
During an ESD, why should safety injection be throttled as soon as the throttle criteria is met?
A. Prevents excessive cooldown.
B. Minimizes erosion damage to the injection valves.
C. Minimizes the time SI pumps are running on mini-flow.
D. Minimizes the possibility of pressurized thermal shock.
D. Minimizes the possibility of pressurized thermal shock.
The most likely diagnosis for this condition is:
A. Uncomplicated Reactor Trip.
B. Steam Line Break (ESD) outside containment.
C. Feedline break (ESD) outside containment.
D. Large Break LOCA.
C. Feedline break (ESD) outside containment.
What parameter is inadequate for throttling HPSI?
A. steam generator level.
B. subcooling margin.
C. pressurizer level.
D. Safety Injection flow.
A. steam generator level.
Based on these conditions, the operator should:
A. Start all available charging pumps.
B. throttle HPSI immediately.
C. immediately reduce RCS pressure to lower subcooling to less than 100°F.
D. increase heat removal on SG 1 to stabilize Tc
D. increase heat removal on SG 1 to stabilize Tc
Based on these conditions, the Control Operator should…
B. continue the cooldown to a Tcold of 500°F.
C. initiate an MSIS and stabilize temperature using ADVs.
D. allow the RCS to heat up to its normal post trip band of 560° to 570°F Tcold.
A. stabilize RCS temperature at its present value with SBCS in manual.
Which of the following actions is appropriate?
A. Cool down and repressurize the RCS.
B. Cool down and maintain RCS pressure constant.
C. Depressurize and maintain RCS temperature constant.
D. Heat up and repressurize the RCS.
C. Depressurize and maintain RCS temperature constant.
Which one of the following plant parameters is an indication that an excessive steam demand event is occurring? Assume the S/G is not dried out.
A. Lowering RCS temperature with increasing containment pressure.
B. Increasing reactor power with increasing RCS temperature.
C. Lowering RCS temperature with increasing pressurizer level.
D. Lowering RCS temperature with increasing pressurizer pressure.
A. Lowering RCS temperature with increasing containment pressure.
Is there a concern with continuing to feed the affected S/G following an ESD event?
A. No, it will minimize the rebound effect.
B. Yes, it will fill the S/G and cover the tubes.
C. Yes, it will cause the RCS to cool down further and affect reactivity.
D. No, it will minimize the need for auxiliary feedwater.
C. Yes, it will cause the RCS to cool down further and affect reactivity.
With no operator action, which of the following describes the status of SG feedwater?
A. AFA and AFB are feeding both SGs.
B. Neither SG is receiving feedwater
C. AFA and AFB are feeding SG 1 only.
D. MFW is feeding both SGs in RTO at greater than 250 gpm.
B. Neither SG is receiving feedwater
Based on these conditions, the operating crew should:
A. immediately select CEAs for large load reject and manually initiate a cutback.
B. start a rapid shutdown per 40OP-9ZZ05, Power Operations.
C. trip the reactor.
D. insert CEAs in manual sequential.
C. trip the reactor.
Comparing the plant response to this action versus how the plant would have responded if the “LARGE LOAD REJECT” pushbutton has been depressed, which of the following is accurate?
The actions taken would result in…
A. a larger rise in pressurizer pressure.
B. more CEAs dropped on the RPCB.
C. fewer CEAs dropped on the RPCB.
D. a smaller rise in pressurizer pressure.
A. a larger rise in pressurizer pressure.
In order to manually initiate the required RPCB, the crew must:
A. depress and hold the DROP SUBGROUPS pushbutton, and then depress SUBGROUP SELECT pushbuttons 4, 5 and 22.
B. simultaneously depress the DROP SUBGROUPS and LOSS OF FEED PUMP pushbuttons.
C. first depress the DROP SUBGROUPS pushbutton, release, and then depress the LOSS OF FEED PUMP pushbutton.
D. first depress and release the DROP SUBGROUPS pushbutton, then the LOSS OF FEED PUMP pushbutton followed by SUBGROUP SELECT pushbuttons 4, 5 and 22.
B. simultaneously depress the DROP SUBGROUPS and LOSS OF FEED PUMP pushbuttons.
Based on current plant conditions and no additional Operator actions taken which of the below listed circumstances would cause a Quick Open block to be generated…..
A. Main Feed Pump “B” trip
B. Loss of NNN-D15
C. Main Turbine trip
D. Reactor Trip
D. Reactor Trip
A large load rejection has resulted in a RPCB. This load rejection was due to a spurious failure in the EHC system and did NOT result in a turbine trip. RPCB has been taken to Test Reset and Auto Actuate Out of Service. The Operating Crew desires to pick up load on the Main Turbine.
In order to accomplish this, the Secondary Operator must…
A. raise the setting of the LOAD LIMIT potentiometer, since the setting of this control follows the SETBACK and RUNBACK down.
B. first reduce the LOAD LIMIT potentiometer until the LOAD LIMITING light comes on, then pick up load as necessary.
C. perform this manipulation with the LOAD SET pushbutton since the LOAD LIMIT potentiometer is out of the circuit until the original (pre-rejection) load has been established.
D. reduce turbine load below 15% to clear the SETBACK, then raise load as desired using the LOAD LIMIT potentiometer.
B. first reduce the LOAD LIMIT potentiometer until the LOAD LIMITING light comes on, then pick up load as necessary.
At what power level should the reactor be stabilized?
A. 2%
B. 12%
C. 35%
D. 40%
B. 12%
What actions will occur if the operator now simultaneously pushes the LOSS OF FEEDPUMP and DROP SUBGROUPS pushbuttons?
A. No actions will occur.
B. Subgroups 4, 5 and 22 will drop. A turbine setback and runback will occur and the load limiter will engage.
C. ONLY a turbine runback will occur.
D. ONLY a turbine setback and turbine runback will occur.
D. ONLY a turbine setback and turbine runback will occur.
Following a Reactor Power Cutback, how should the operating crew comply with Technical Specification 3.1.7, Regulating Control Element Assembly (CEA) Insertion Limits?
A. Enter the appropriate action, but add 2 hours to the completion time.
B. Enter the appropriate action, but add 4 hours to the completion time.
C. Do not apply the limiting condition for operation for up to 4 hours following the RPCB.
D. Do not apply the limiting condition for operation for up to 2 hours following the RPCB.
D. Do not apply the limiting condition for operation for up to 2 hours following the RPCB.
Based on these conditions the operator is directed to….
A. trip the reactor and perform SPTA’s.
B. depress the ‘Drop Sub Grps’ and ‘Loss of Feed Pump’ pushbuttons.
C. reduce the load limit potentiometer to 845 MW.
D. reduce the load limit potentiometer to 890 MW.
D. reduce the load limit potentiometer to 890 MW.
Based on this, the RPCS will drop selected CEAs and the Main Turbine will…
A. Setback, Not Runback.
B. Setback, Continuously Runback.
C. Not Setback, Not Runback.
D. Not Setback, Continuously Runback.
B. Setback, Continuously Runback.
Which of the following describe the plant response?
A. A normal RPCB will be initiated.
B. The reactor will trip if group 5 is not inserted manually within 40 seconds following the RPCB signal.
C. A RPCB will initiate with group four providing sufficient negative reactivity to offset the reduction of feedwater.
D. The reactor will trip immediately.
D. The reactor will trip immediately.