3rd Step Flashcards

(46 cards)

1
Q

What does a qualified electrical employee mean?

A

An employee who by reason of experience of instruction is familiar with the operation to be performed and the hazards involved

**APM Definitions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What does a qualified electrical worker mean?

A

An employee with a minimum of two years training and experience with high voltage circuits and equipment and has demonstrated by performance is familiar with the work and hazards involved

** APM Definitions.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What’s the minimum depth of a trench that can be entered without shoring?

A

5 feet

** APM Rule 146 Trenches and Excavations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How many pipe straps are required per 10 foot section of riser?

A

3 straps

** DUG CR 110.1 note 7

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How many unit struts are required per 10 foot section of riser?

A

2

** DUG CR 110.1 note 8

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How soon should a hazard be reported?

A

Immediately

** APM P-18 Reporting Hazards

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

How often should high-voltage rubber blankets be dielectrically tested or inspected?

A

Rubber gloves, sleeves, and blankets used on high-voltage conductors shall be directly tested at least once every six months.

** APM Rule 131 uh

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What should be done when using rubber blankets on the ground?

A

When using rubber blankets on the ground they shall be protected from physical damage and moisture by means of tarpaulin, canvas or protective mat.

** APM Rule 131

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is the minimum amount of time to wait before entering an underground structure when new cable has been energized for the first time?

A

5 minutes.

APM Rule 303 Energizing Equipment.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

According to the APM what shall be done prior to and after moving or bending any in-service cable?

A

The cable shall be carefully inspected before and after moving

** APM Rule 307 Moving Underground Cable

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

When will the automatic circuit reclosure on an underground circuit being worked be made non-automatic?

A
  1. Splicing or patching energized high-voltage UG cable
  2. Relocating energized high-voltage underground cable or equipment
  3. filtering or replacing oil on energized high-voltage underground equipment
  4. Operating load break elbows
  5. Whenever the supervisor deems necessary

** APM Rule 316

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Why is it necessary to use a live line voltage tester?

A

To test normally energized parts of a circuit as de-energized.

** APM Rule 141 Grounding.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

When distribution personnel work inside a station who takes the clearance?

A

And Operator, shift supervisor, or station electrician on duty

** APM Rule 707

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Can 600 amp plug-in terminations and components be removed by hand if they have been tested de-energized with a high voltage tester?

A

No, Live line tools are required for removing and installing 600 amp plug in terminations except when complying with applicable sections of rule 306

** APM Rule 312

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What 7 things are required on a cable tag?

A
  1. Adjacent switch position
  2. Adjacent switch number
  3. Adjacent switch structure number
  4. Next adjacent through structure number.
  5. Next adjacent structure footage
  6. Direction to next adjacent structure.
  7. Operating voltage.

Ex. From gs12 pos 3 @ v29 to v30 200’ W 12kv

** DUG IC 130.4.1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

An SF6 gas switch inside a vault is suspected to have catastrophically fail what additional atmospheric monitoring is required prior to entering this vault?

A

Testing for sulfur dioxide.

DOM TE -13 2.1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

What does the oxygen tester test for?

A

For combustible gas, oxygen, hydrogen sulfide, carbon monoxide, and oxygen.

*** DOM TE -13 2.1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

What depth should a CIC riser extend below grade?

A

45” minimum.

DUG CR 120-1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

When working in or around vaults what precautions must be made?

A
  • Atmospheric testing and monitoring
  • Barricades

** APM RULE 301 other confined spaces.

20
Q

After de-energizing and before proceeding with the work on all power supply cables normally energized in excess of 600 V where should all conductors be short-circuited and grounded?

A

Between the place where the work is being performed and each possible source of supply.

** APM RULE 306 working on de-energized ug cable.

21
Q

Identify the four conditions required to create a potential for ferroresonance.

A
  • The transformer has a phase to phase primary or wye primary with a UG neutral
  • phases are de-energized or energized one phase at a time.
  • secondary load on radial is insignificant compared to the cable length being switched.
  • when the length of the cable is greater than or equal to the length of the coils in the transformer.
  • cable and coil being de-energized or energized at the same time.

** DOM TR-8

22
Q

Switch may be considered de-energize for switching only when what conditions exist?

A

Switch contains one circuit and is in a dead section of the line verified through switching center.

*** APM RULE 309 UG switches

23
Q

Name the four ways to eliminate ferroresonance including design considerations?

A
  • gang operated switches
  • energize or de-energize cable separate from coils
  • secondary load.
  • phase to ground primary connections.

** DDS -2 5.13 B

24
Q

Explain how and when to address back feed.

A
  • there’s a possibility of backfeed when touching the deenergized high voltage side of the transformer (or wires connected to the high side of the transformer) that is still connected to the secondaries.
  • eliminate with an open or grounding

APM RULE 149 grounding.

25
What are the characteristics of a 400 amp RAC switch?
- first position has only two options open or closed - The other three positions have open,closed, and tie. ** DOM SW-3
26
What are the characteristics of a 400 amp RAK switch?
- First position is straight to the bus, doesn't open or close. - Second position has only open or closed - all other positions have open, closed, and tie. DOM SW-3 pg 10
27
What are the characteristics of a 400 amp RAM switch?
All positions are only open or closed. ** DOM SW-3
28
Describe the application of a RAG switch.
RAG switches were developed to simplify the grounding procedure with its internal grounding attitude on each position. ** DOM SW-5
29
What is the maximum distance between unistruts when attaching a riser?
First unistrut at 8' from the ground and a maximum of 5' after that. **DUG CR 141
30
Under what conditions is it permissible for employee to enter an underground structure without anyone else in attendance?
- Barricade opening - force ventilation - there are no energized cable or equipment in structure. ** APM RULE 302
31
What is the specified loading range for RO transformers?
They should be loaded to a minimum of 60% and a maximum of 100% of their nameplate rating. * DDS-5 5.6
32
For what situation, primarily, is EPR cable used? Why?
It's used to replace lead cable that has ducts to small for CLP cable. ** DUG IC 125.1
33
Is it permissible to construct a three-phase bank with three single phase fused burd Transformers? why or why not?
Yes fused burds may be used but do not use fused burds in a close delta bank. ** DUG PD 217 note 2
34
How often should gas and oxygen monitors be tested for calibration? how are the calibration records handled?
Monthly In the foreman monthly * DOM TE-6 and TE-13
35
May PMEs or PMHs be used to de-energize capacitor banks? explain.
No. they cannot break capacitive load so a sign must be placed in the door compartment which says the Cat Bank number and says open cat bank before opening this switch. * DOM SW-6 2.1
36
What is the purpose of load break fuse cabinets? what type of fuses do they use?
They are used to provide a method for fusing 6.9 KV or 9.4 KV residential radials. They use parallel current limiting fuses. 2-40a ** DOM PD-4 1.0
37
After replacing the fuses inside a load brake fuse cabinet what is the sequence for energizing the cabinet?
After replacing fuses, the fuse cabinet shall be energized with the line side load break elbow first then the load side load break elbow will be used to pick up the load. **DOM PD -4 4.1.h
38
What cable sizes are utilcos with 2 set screws designed to fit? How many ways are these utilcos available?
4/0 to 700 4 way and 6 way ** DUG JJ 255-1
39
What's the definition of a confined space?
1. A space large enough that employee can bodily enter 2. Has limited openings for entry or exit 3. Is not designed for continuous employee occupancy ** son rule 143
40
What is the definition of an other confined space?
1. Existing ventilation is insignificant to remove dangerous air contamination. 2. Ready access in or out of the space for a removal of a sudden disabled employee is difficult due to location and/or size of opening ** APM RULE 301
41
Is it permissible to remove fuses from energized underground equipment?
No. unless they are due is designed to be installed and removed and only with live line tools. ** APM rule 304
42
``` What type and size fuses are used in single phase 12 KV burd transformers of the following sizes: 25kva 50kva 75kva 100kva ```
25 kva: 6 50 kva: 8 75 kva: 10 100 kva: 12 Current limiting. **DUG PD 210-1
43
For what applications are MCAN in and MCLF fusing options designed?
MCAN: up to 80A MCLF: 100- 180 A ** DUG PD 305.1
44
What precautions must be taken prior to energizing any new piece of cable or equipment?
- No piece of cable or switching device shall be energized until it has been positively identified by tags or other approved means - No piece of equipment shall be energized until all terminals cables and positions have been safe ended or otherwise protected in a way that would prevent short-circuit, ground or personal contact * APM RULE 303
45
Is it permissible to stack a 200 amp tap on a 600 amp termination located on a pad mounted RAM gas switch?
Yes. Only one 200 amp tap is permissible on a single 600 amp termination. * DUG SE -260-1
46
Prior to operating any switch or PON fuse in a single phase or three phase pad mounted transformer what to precautions must be taken?
- Pressure relief device shall be operated to relieve internal pressure. - Oil level must be verified on oil level indicate. DOM TR-2 4.1