What are the ECCS Injection order with pressures?
What are the ECCS Design Criteria from 10CFR50.46?
When does the ECCS injection phase end?
What is the RWST Tech Spec Limit?
When are the accumulators outlet valves open and deenergized (i.e., required to be operable)
How many accumulators are necessary to inject into the core? (FSAR Assumption)?
What are the SI pump trips?
- Overload/Overcurrent
When are IMO-262 and IMO-263 (SI Pump to RWST recirc valves) open?
When do IMO-262 and IMO-263 (SI Pump to RWST recirc valves) auto close?
When are IMO-270 and IMO-275 (SI train x-tires) normally open and when are they closed?
What will give you an SI signal?
What is the RWST Tech Spec Basis?
When do you align Hot Leg Recirc?
When do you NOT align Hot Leg Recirc?
When do we initiate RHR Spray after an accident and when is in required/not required?
What is the ECCS Leakage limits for CR habitability?
What does TS 3.5.1 (Accumulators) state?
What does TS 3.5.2 (ECCS, operating) state?
(3.5.2: 1 Train = CCP, SI and RHR)
What does TS 3.5.3 (ECCS, Shutdown) state?
What does TS 3.5.4 (RWST) state?
What are the Accumulator parameters?