OPERATIONAL METHOD STATEMENTS #3 Flashcards

(14 cards)

1
Q

Implement BA Stage 1 where it is necessary to use BA and monitor BA wearers at the incident, where the following circumstances exist:

  • BA operations are _________ and not ____________
  • The ____________ requires no more than one BA Entry Point
  • BA ____________ are not required
A

limited; complex
incident
guidelines

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Record the following on the BA control board: (4)

A
  • Names of personnel operating within the hazardous atmosphere (hot zone)
  • BA Team call sign and location
  • Low air and time whistle
  • Allocated fireground channel(s)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Nominate Sector Commanders for the following highrise sectors:

A

Lobby Sector: Maintains control over personnel entering and/or exiting the building, and of lifts in building.

Fire Sector: Coordinates all mitigation and search activities.

Evacuation Sector: Coordinates the evacuation plan.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Internal vs external staging officers:

A

External Staging Officer for appliances and support personnel at designated Staging Area.

Internal Staging Officer for personnel and equipment in the lobby of the building.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Highrise Full Evacuation

Consider full evacuation when any of the situations are observed: (6)

A
  • Internal breach of compartmentation
  • External fire on buildings with known
    combustible cladding
  • Any external fire spread beyond two floors
  • Failure of installed sprinkler or hydrant system
  • Uncontrolled self-evacuation of large numbers
    of people
  • Insufficient resources available to mount an
    effective attack on the fire
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Ensure lift operator is equipped the following equipment: (6)

A
  • Lift access keys
  • Full structure fire PPC
  • Breathing Apparatus (not required to be ‘on air’)
  • Personal radio
  • Dry powder extinguisher
  • Forcible entry equipment.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Consider implementing the following DEBRiS sectors:

A
  • Decontamination of personnel
  • Entry and exit of Hot Zones
  • Breathing Apparatus (BA) service areas
  • Rehabilitation of personnel
  • incident accountability of all personnel (this is
    not a sector but provides systematic
    accountability)
  • Staging Area (vehicles and personnel).
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Controlling exposure to Asbestos

A

Minimise disturbance of any material suspected of containing asbestos, and ensure it is wet down and remains damp and intact.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Deploy a RIT in the following circumstances: (4)

A
  • Call of distress “Mayday”
  • BA full alarm activation
  • Loss of accountability identified by PAR
  • Any other situation requiring rapid intervention
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Highrise key functional roles OMS 028: (3)

A

Evacuation Sector Commander

Lobby Sector Commander

Stairwell Safety Officer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Considerations for DEBRIS Base of Operations: (6)

A

Atmospheric Monitoring

Current and forecast weather conditions

Access to potable water for clean up

Access to natural shelter

Lighting

Access for oncoming appliances

Adjacency to the warm zone

Wind, terrain and water run off

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Potential for asbestos at structures, pay particular attentions to: (5)

A

Buildings constructed before 2004

Flat or corrugated sheet

Lagging on water pipes

Insulation of older water pipes, heaters, stoves

Ceiling insulations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Document and maintain written records for the following incidents: (4)

A

large, complex, protracted incidents involving one or more changes of shift

Incident likely to result in Coronial inquiry or criminal investigation

Mayday or Red Flag Warning issued

Any incident where it may be prudent to note info as possible evidence in investigation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Consider the following records for incident management: (7)

A

AIRS Report

EMR PCR

HAZMAT incident documentation

IMT/EMT briefing notes

IAPs including comms plans and maps

Personally issued logbooks

Tasking to assist tracking resources for PAR.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly