Who approves the use of temporary logs?

Unit Supervisor
OR
Shift Manager

What is the purpose of 0PSP03-XC-0002 Initial Containment Inspection to Establish Integrity?


Verify 48” containment purge valves closed
Verify 18” Supplementary purge valves open/closed
What does front stop completion time and the back stop completion time mean?

Note:
Risk-Management Technical Specifications (RMTS): Plant-specific set of configuration-based Technical Specifications, based on a formally approved configuration risk management program and associated probabilistic risk assessment, designed to supplement previous conventional plant Technical Specifications.

What puts you in action level 3 for primary to secondary leakage?

Leakage from 1 S/G:

What must CV-0198 RMW Isolation be throttled to in MODE 5?

< 110 GPM

Note:
Limited to < 125 gpm per LCO 3.4.1.4.1 Cold S/D Loops Filled
What is a high risk work activity?

Cause / Would Cause:
Unit loses all power generation capability
Reduce power ≥ 20%
Entry into LCO that requires S/D in ≤ 24 hrs

According to 10CFR50.72, Immediate Notification Requirements for Operating Nuclear Power Reactors, what situations require the NRC to be notified within 1 hour?
Emergency Class Declared
Deviation from Tech Specs
Safety Limit / T.S. Section 2.0 Exceeded
Unplanned Criticality
Radiological, Security, Environmental Events
How often is it required to flush the Fire Protection Header?

Once per year
What are the action levels for identified leakage?


When are valves in the AFWST pit required to be checked?

If security barrier is breached

When can risk management tech specs (CRMP) be applied?

MODES 1 - 2

Applies to extended LCO times.
What is the maximum yearly dose that a visitor that is not qualified for unescorted access to the RCA can obtain?


What actions shall be performed for a secondary chemistry action level 1?

Generate CR
Return parameter < Action Level 1 Value
Have 21 days until it becomes action Level 2

While performing a hourly fire watch, what does 0PGP03-ZF-0001 (Fire Protection Program) specifically say is not allowed?

Using a cell phone / mp3 / gaming devices

What is required to maintain an active license each quarter?

Seven (7) 8 hr shifts
Five (5) 12 hr shifts
Physicals are valid

Who must be specifically notified if a fire suppression system is OOS for > 48 hours?

STP’s Insurer

How often is the operator aid review performed?

Quarterly

Performed by issuing authority.
Note:
The continuing need for each Operator Aid does not need to be verified. (kinda strange)
If AFD alarm has been inoperable for > 24 hrs, how often must AFD be logged?

Every 30 mins

When can the STA stand watch as the Unit Supervisor, Primary RO, or Secondary RO?

US / RO must be available to re-relieve the STA if STA becomes activated
US / RO must be in same unit as STA
US / RO must perform shift turnover on same unit

Who can perform all sections of this surveillance with exception of closing out the surveillance?

Non-Licensed work control SRO

If a Øa occurs while personnel are in containment, where should personnel evacuate?

Aux Air Lock

If Aux Air Lock unavailable, must reset Øa and open the PAL OCIV. Personnel can then exit via the PAL.
When are the emergency operations lockers audited?

Quarterly

Which radiation detectors should be functional for moving irradiated fuel?
RT-8010B
OR
RT-8050 OR RT-8051

What must be done for each of the action levels?

Action Level 1:
Monitoring
Notifications
Action Level 2:
MAB Walkdowns
Monitoring
Notifications
Off Hours notification for Duty Ops Manager
Action Level 3:
MAB / RCB Walkdowns
Monitoring
HP Surveys / SG Samples
Notifications
Off Hours notification for everyone