What conditions will allow entry into 0POP05-EO-FRZ2?

Containment Water Level ≥ 69”

How is the depress performed while in 0POP05-EO-ES05?

PZR Level < 50%:
Aux Spray
PZR PORV

How does Addendum 6 in 0POP05-EO-EC33 restore letdown with a low PZR level?

Sends Operator to ASP to open LCV-0465, LCV-0468, and FV-0011

Bypasses low PZR Level Letdown Isolation (17%)
Note:
LCV-0468 and FV-0011 transfer switches on EAB 60’. LCV-0465 is on EAB 10’.
What are the major actions of 0POP05-EO-FRC1?

Start 3 SI trains
RNO will start both CCPs w/ Max Charging
(Will substitute PDP if CCP not available)
Start RCPs
Open PZR PORVs
Open Rx Head Vents

At what containment pressure is containment spray secured?


May be required for up to 6.5 hrs after DB LOCA to reduce Iodine for 30 day habitability of control room and TSC.
If the initiating event of the Rx Trip was a loss of feedwater, what is the time critical action in 0POP05-EO-ES01?

At least 3 AFW pumps required to be in service within 15 mins of Rx Trip

Prevents PZR overfill
While in 0POP05-EO-EC21, what must the operator limit AFW flow / SG if you exceed the following parameters?

100 gpm

Not required to enter 0POP05-EO-FRH1 if due to operator actions.
What conditions will allow entry into 0POP05-EO-FRH1?

SGNR ≤ 14% [34%] in ALL SGs
AND
Total AFW Flow ≤ 576 gpm

0POP05-EO-FRC3 should not be entered if you are in what procedure?


EC32 puts you in saturated conditions and FRC3 tries to fix it. Counterproductive….
Note:
Procedure has you get SI / CCP flow and isolate RCS vent paths.
When do you stop the depress in 0POP05-EO-FRP1?

PZR Level > 70% [50%]
OR
Subcooling < 45 ˚F [55 ˚F]
OR
RCS Pressure < 73 psig

What procedure does the operators enter when they have completed 0POP05-EO-EC02?

0POP05-EO-EO10
Loss of Rx or Secondary Coolant

What sources of water are unaccounted in the containment floodup calculation?

CCW
RCB Chilled Water
Rx Makeup Water
FPS

How long does the operator have to restore CCW to the RCFCs following a LOOP?

30 Minutes

What conditions will allow entry into 0POP05-EO-FRC3?
Subcooling ≤ 35 ˚F [45 ˚F]
AND
CETs < 708 ˚F

RVWL doesn’t really matter in this case.
What conditions will allow entry into 0POP05-EO-FRS1?


What conditions will allow entry into 0POP05-EO-FRZ1?

Containment Pressure ≥ 9.5 psig

≥ 56.5 psig is a red path.
What procedures need ≥ 2 SGs to cooldown the plant?
Two (2) SGs:
0POP05-EO-ES05
Natural Circ C/D w/o Letdown
0POP05-EO-EO20
Faulted SG Isolation
0POP05-EO-EC21
Uncontrolled Depress of All SGs
0POP05-EO-ES31/32/33
Post-SGTR Cooldown Using Backfill / Blowdown / Steam Dumps
0POP05-EO-EC31/32/33
SGTR w/ Loss of Rx Coolant - Subcooled (31) / Saturated (32) Recovery Desired
SGTR w/o PZR Pressure Control (33)
Three (3) SGs:
0POP05-EO-ES01**
Rx Trip Response
Note:
Need within 15 mins if Rx trip was due to loss of feedwater.
What is the purpose of verifying the turbine tripped?

Prevents an uncontrolled C/D

Note:
This is the basis for all step 2 substeps as well
What are your RCP trip criteria while in 0POP05-EO-EC21? (Unique Criteria)

HHSI - At least 1 Running
AND
Primary / Secondary ∆P - < 164 psid [336 psid]
Note:
Procedure will have you go to 0POP05-EO-EO10 if RCS Pressure ≤ 415 psig.

Why does 0POP05-EO-ES05 have the operator re-align the CCP suction to the BAT tanks?

BAT tanks are higher boron concentration (7000 ppm) than RWST (2800 ppm)

Get more boron for less inventory. (No letdown)
Note:
BAT tank must have > 2500 gal
What conditions will allow entry into 0POP05-EO-FRZ3?

Containment Radiation ≥ 2100 R/hr

What is the SI termination criteria for 0POP05-EO-EC33?

Secondary Heat Sink:
Total AFW Flow > 576 GPM
OR
SGNR in ≥ TWO (2) SGs > 14% [34%]
Ruptured SG Level:
Rising in Uncontrolled Manner
OR
Off Scale High

When will 0POP05-EO-EC21 have the operator go back to 0POP05-EO-EO20?

If any SG pressure rises except during SI termination in Steps 19/20

Note:
Unlike 0POP05-EO-EO30 CIP action, do not have to start SI pumps for 0POP05-EO-EO20 transition.
If the faulted SG was isolated in 0POP05-EO-FRS1, does the operator need to transtition to 0POP05-EO-EO20 once 0POP05-EO-FRS1 is complete?

No

0POP05-EO-FRS1 has the exact same steps and 0POP01-ZA-0018 allows you to skip transitioning to 0POP05-EO-EO20.