EOPs Flashcards

(114 cards)

1
Q
  • 0POP05-EO-FRZ2 Response to Containment Flooding*
    • *

What conditions will allow entry into 0POP05-EO-FRZ2?

A

Containment Water Level ≥ 69”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  • 0POP05-EO-ES05 Natural Circulation C/D w/ Loss of Letdown*
    • *

How is the depress performed while in 0POP05-EO-ES05?

A

PZR Level < 50%:
Aux Spray
PZR PORV

  • PZR Level ≥ 50%:*
  • *Head Vents**
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  • 0POP05-EO-EC33 SGTR w/o PZR Pressure Control*
    • *

How does Addendum 6 in 0POP05-EO-EC33 restore letdown with a low PZR level?

A

Sends Operator to ASP to open LCV-0465, LCV-0468, and FV-0011

Bypasses low PZR Level Letdown Isolation (17%)

Note:
LCV-0468 and FV-0011 transfer switches on EAB 60’. LCV-0465 is on EAB 10’.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
  • 0POP05-EO-FRC1 Response to Inadequate Core Cooling*
    • *

What are the major actions of 0POP05-EO-FRC1?

A

Start 3 SI trains
RNO will start both CCPs w/ Max Charging
(Will substitute PDP if CCP not available)

  • Done if One (1) SG > 14% [34%] OR > 576 gpm AFW Flow*
  • *Depress intact SGs < 306 psig**
  • Will inject Accumulators / LHSI pumps*
  • *Depress intact SGs to atmospheric**
  • Maximize SI Flow*

Start RCPs

Open PZR PORVs

Open Rx Head Vents

  • *Depress intact SGs to atmospheric**
  • Do not care about SG Level / AFW anymore.*
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
  • 0POP05-EO-E010 Loss of Rx or Secondary Coolant*
    • *

At what containment pressure is containment spray secured?

A
  • *6.5 psig**
  • Need TSC Approval*

May be required for up to 6.5 hrs after DB LOCA to reduce Iodine for 30 day habitability of control room and TSC.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  • 0POP05-EO-ES01 Rx Trip Response*
    • *

If the initiating event of the Rx Trip was a loss of feedwater, what is the time critical action in 0POP05-EO-ES01?

A

At least 3 AFW pumps required to be in service within 15 mins of Rx Trip

Prevents PZR overfill

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
  • 0POP05-EO-EC21 Uncontrolled Depress of all SGs*
    • *

While in 0POP05-EO-EC21, what must the operator limit AFW flow / SG if you exceed the following parameters?

  • RCS CDR: ≥ 100 ˚F/hr
  • SGNR Level: ≤ 14% [34%]
A

100 gpm

Not required to enter 0POP05-EO-FRH1 if due to operator actions.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q
  • 0POP05-EO-FRH1 Response to Loss of Secondary Heat Sink*
    • *

What conditions will allow entry into 0POP05-EO-FRH1?

A

SGNR ≤ 14% [34%] in ALL SGs
AND
Total AFW Flow ≤ 576 gpm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q
  • 0POP05-EO-FRC3 Response to Saturated Core Cooling*
    • *

0POP05-EO-FRC3 should not be entered if you are in what procedure?

A
  • *0POP05-EO-EC32**
  • SGTR w/ LOCA - Saturated Recovery*

EC32 puts you in saturated conditions and FRC3 tries to fix it. Counterproductive….

Note:
Procedure has you get SI / CCP flow and isolate RCS vent paths.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q
  • 0POP05-EO-FRP1 Response to Iminent BFPL*
    • *

When do you stop the depress in 0POP05-EO-FRP1?

A

PZR Level > 70% [50%]
OR
Subcooling < 45 ˚F [55 ˚F]
OR
RCS Pressure < 73 psig

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q
  • 0POP05-EO-EC02 Loss of All AC Power w/ SI Required*
    • *

What procedure does the operators enter when they have completed 0POP05-EO-EC02?

A

0POP05-EO-EO10
Loss of Rx or Secondary Coolant

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q
  • 0POP05-EO-FRZ2 Response to Containment Flooding*
    • *

What sources of water are unaccounted in the containment floodup calculation?

A

CCW

RCB Chilled Water

Rx Makeup Water

FPS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q
  • 0POP05-EO-ES01 Rx Trip Response*
    • *

How long does the operator have to restore CCW to the RCFCs following a LOOP?

A

30 Minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q
  • 0POP05-EO-FRC3 Response to Saturated Core Cooling*
    • *

What conditions will allow entry into 0POP05-EO-FRC3?

A

Subcooling ≤ 35 ˚F [45 ˚F]
AND
CETs < 708 ˚F

RVWL doesn’t really matter in this case.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q
  • 0POP05-EO-FRS1 Response to ATWS*
    • *

What conditions will allow entry into 0POP05-EO-FRS1?

A
  • Red Path:*
  • *Extended Range Flux ≥ 5%**
  • Orange Path:*
  • *Extended Range Flux ≥ 5x10-6 % w/ + SUR**
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q
  • 0POP05-EO-FRZ1 Response to High Containment Pressure*
    • *

What conditions will allow entry into 0POP05-EO-FRZ1?

A

Containment Pressure ≥ 9.5 psig

≥ 56.5 psig is a red path.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q
  • AFW Requirements*
    • *

What procedures need ≥ 2 SGs to cooldown the plant?

A

Two (2) SGs:
0POP05-EO-ES05
Natural Circ C/D w/o Letdown

0POP05-EO-EO20
Faulted SG Isolation

0POP05-EO-EC21
Uncontrolled Depress of All SGs

0POP05-EO-ES31/32/33
Post-SGTR Cooldown Using Backfill / Blowdown / Steam Dumps

0POP05-EO-EC31/32/33
SGTR w/ Loss of Rx Coolant - Subcooled (31) / Saturated (32) Recovery Desired
SGTR w/o PZR Pressure Control (33)

  • *0POP05-EO-FRZ1**
  • Response to High Containment Pressure*

Three (3) SGs:
0POP05-EO-ES01**
Rx Trip Response

Note:
Need within 15 mins if Rx trip was due to loss of feedwater.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q
  • 0POP05-EO-EO00 Rx Trip or SI*
    • *

What is the purpose of verifying the turbine tripped?

A

Prevents an uncontrolled C/D

Note:
This is the basis for all step 2 substeps as well

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q
  • 0POP05-EO-EC21 Uncontrolled Depress of all SGs*
    • *

What are your RCP trip criteria while in 0POP05-EO-EC21? (Unique Criteria)

A

HHSI - At least 1 Running
AND
Primary / Secondary ∆P - < 164 psid [336 psid]

  • RCS Pressure will drop due to uncontrolled depress of S/Gs (Cooldown). Cannot use normal 1430 psig.
  • If primary with ∆P requirement, that is indicative of a LOCA.

Note:
Procedure will have you go to 0POP05-EO-EO10 if RCS Pressure ≤ 415 psig.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q
  • 0POP05-EO-ES05 Natural Circulation C/D w/ Loss of Letdown*
    • *

Why does 0POP05-EO-ES05 have the operator re-align the CCP suction to the BAT tanks?

A

BAT tanks are higher boron concentration (7000 ppm) than RWST (2800 ppm)

Get more boron for less inventory. (No letdown)

Note:
BAT tank must have > 2500 gal

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q
  • 0POP05-EO-FRZ3 Response to High Rad Levels*
    • *

What conditions will allow entry into 0POP05-EO-FRZ3?

A

Containment Radiation ≥ 2100 R/hr

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q
  • 0POP05-EO-EC33 SGTR w/o PZR Pressure Control*
    • *

What is the SI termination criteria for 0POP05-EO-EC33?

A
  • RCS Subcooling:*
  • *> 35 ˚F [45 ˚F]**

Secondary Heat Sink:
Total AFW Flow > 576 GPM
OR
SGNR in ≥ TWO (2) SGs > 14% [34%]

  • RCS Inventory:*
  • *RVWL Plenum ≥ 85%**

Ruptured SG Level:
Rising in Uncontrolled Manner
OR
Off Scale High

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q
  • 0POP05-EO-EC21 Uncontrolled Depress of all SGs*
    • *

When will 0POP05-EO-EC21 have the operator go back to 0POP05-EO-EO20?

A

If any SG pressure rises except during SI termination in Steps 19/20

Note:
Unlike 0POP05-EO-EO30 CIP action, do not have to start SI pumps for 0POP05-EO-EO20 transition.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q
  • 0POP05-EO-FRS1 Response to ATWS*
    • *

If the faulted SG was isolated in 0POP05-EO-FRS1, does the operator need to transtition to 0POP05-EO-EO20 once 0POP05-EO-FRS1 is complete?

A

No

0POP05-EO-FRS1 has the exact same steps and 0POP01-ZA-0018 allows you to skip transitioning to 0POP05-EO-EO20.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
* 0POP05-EO-ES05 Natural Circulation C/D w/ Loss of Letdown* * * * How is PZR Level maintained \< 90% while in 0POP05-EO-ES05?
**Cycle Head Vents to maintain PZR LVL 85% - 90%**
26
* 0POP05-EO-FRP1 Response to Iminent BFPL* * * * What is the SI termination criteria in 0POP05-EO-FRP1?
**Subcooling \> 85 ˚F [95 ˚F]** **No RCPs: RVWL Plenum ≥ 20%** **RCPs: RVWL Plenum ≥ 85%** * * * Reinitiation: * Subcooling ≤ 35 ˚F [45 ˚F] * RVWL Plenum \< 20%
27
* 0POP05-EO-EC32 SGTR w/ LOCA - Saturated Recovery* * * * What are the SI reinitiation criteria for 0POP05-EO-EC32?
**CETs Rising _OR_ RVWL Plenum \< 85%**
28
* 0POP05-EO-ES03 Natural Circulation C/D with Voids* * * * What CDR and Subcooling is the operator limited to in 0POP05-EO-ES03?
* _CDR:_* * *\< 100 ˚F/hr** * _Subcooling:_* * *\> 55 ˚F**
29
* 0POP05-EO-ES02 Natural Circulation C/D* * * * How many CRDM Vent Fans and Rx Cavity and Support Trains does 0POP05-EO-ES02 have the operators try to start?
* _CRDM Vent Fans:_* * *All 3 Vent Fans** * _Rx Cavity & Support Trains:_* * *1 Train** * * * Helps prevent void formation in the Head.
30
* 0POP05-EO-EO00 Rx Trip or SI* * * * Above what RCS pressure can you secure LHSI pumps?
**\> 415 psig**
31
* 0POP05-EO-ES02 Natural Circulation C/D* * * * What is your CDR in the RCS Cold Legs limited to in 0POP05-EO-ES02?
* _Normally:_* * *100 ˚F/hr** _≥ 1 Inactive OR NOT intact SGs:_ **15 ˚F/hr - 20 ˚F/hr** * _NO CRDM Vent Fans running:_* * *70 ˚F/hr** * * * CDR must be ≥ 15 ˚F/hr to ensure AFWST lasts until RCS Temperature ≤ 350 ˚F (RHR Conditions)
32
* 0POP05-EO-ES01 Rx Trip Response* * * * What are the dilution paths that need to be isolated in 0POP05-EO-ES01?
**BTRS** **Letdown Demins** **RMW Pumps** **RMW Non-Essential Header Isolation Valves** * * * BTRS is not listed as a dilution path in 0POP05-EO-FRS1 (ATWS) and 0POP05-EO-FRS2 (Response to Loss of Core S/D).
33
* 0POP05-EO-FRZ3 Response to High Rad Levels* * * * What is the temperature limit on the containment carbon units?
**200 ˚F** ## Footnote * * * Only 1 fan / train should be placed in service.
34
* 0POP05-EO-ES03 Natural Circulation C/D with Voids* * * * What are the major action categories of 0POP05-EO-ES03?
**Try to Start RCP** * *C/D and Depressurize** * Must control pressure to maintain RVWL Plenum ≥ 85%* **Lockout SI** **Place RHR in Service**
35
* 0POP05-EO-FRP1 Response to Iminent BFPL* * * * If all SGs are faulted while performing 0POP05-EO-FRP1, how does the procedure have you control AFW?
**100 gpm / SG** ## Footnote * * * Protects the SG tubes * * * *Note: Same as 0POP05-EO-EC21 Uncontrolled Depress of All SGs.*
36
* 0POP05-EO-E010 Loss of Rx or Secondary Coolant* * * * At what H2 concentration are the H2 Recombiners placed in service?
**0.5% ≤ H2 \< 4%** * * * * ≥ 4% must consult with TSC * Place 1 in service and 1 in standby * * * *Note: Must be placed in service within 30 mins (FSAR)*
37
* 0POP05-EO-EO00 Rx Trip or SI* * * * What are unique about the safety grade solenoids for the MSIVs?
**The are energize to actuate** ## Footnote * * * Most safety grade solenoids are de-energize to actuate. * * * *Note: That is why we have to fail air to the MSIVs and MSIBs if they fail to shut.*
38
* 0POP05-EO-EC33 SGTR w/o PZR Pressure Control* * * * Why does the first step in 0POP05-EO-EC33 check if ruptured SGNR Level \< 87% [60%]?
**No way to lower RCS pressure.** **RCS filling Ruptured SG.** **Sends you to Securing SI step so Ruptured SG doesn't go solid.**
39
* 0POP05-EO-ES02 Natural Circulation C/D* * * * What subcooling should be maintained in the upper head if you have \< 2 CRDM vent fans while performing a C/D in 0POP05-EO-ES02?
**10 ˚F - 20 ˚F Subcooling** ## Footnote * * * Controlled by cycling Rx Vessel Head Vent Valves.
40
* 0POP05-EO-ES31 Post SGTR C/D using Backfill* * * * How does the operator control AFW to cool off the ruptured SG in 0POP05-EO-ES31/32/33 and 0POP05-EO-EC31/32/33?
**Feed Ruptured SG to a SGNR Level of 82% [55%]** **Allow SGNR Level to Lower to 25% [34%]** **Repeat** * * * Will secure AFW Flow to ruptured SG if not needed for C/D when: * SG Pressure Rapidly Lowering (Faulted) * Ruptured SG Pressure ≥ 1235 psig (About to lift PORV @ 1260 psig) * Ruptured SG Pressure ≤ 306 psig _AND_ SGNR \> 14% [34%]\*\*\*\* * * * *Note: Last criteria is present in ES31/32/33, and EC33 only. The first 2 criteria are present in all 6 procedures. (ES31-33 and EC31-33)*
41
* 0POP01-ZA-0018 EOP User's Guide* * * * What is the definition of an active SG?
**SGNR Level ≥ 14 % [34%]** **_OR_** **AFW Flow ≥ 310 GPM**
42
* 0POP05-EO-FRP1 Response to Iminent BFPL* * * * After you complete your 1 hour soak in 0POP05-EO-FRP1, what is your CDR limit?
**50 ˚F/hr**
43
* 0POP05-EO-ES13 Transfer to CL Recirc* * * * When can FRPs be implemented when in 0POP05-EO-ES13?
**Once steps 1-6 are complete** ## Footnote * * * Minimum required to verify proper switch over to CL Recirc.
44
* 0POP05-EO-ES05 Natural Circulation C/D w/ Loss of Letdown* * * * What will the operator do if letdown or excess letdown is restored while in 0POP05-EO-ES05?
**Transition to 0POP05-EO-ES02 Natural Circ C/D**
45
* 0POP05-EO-EO30 SG Tube Rupture* * * * How many SGs are needed for C/D while in 0POP05-EO-EO30?
**One (1) SG**
46
* 0POP05-EO-FRH2 Response to SG Overpressure* * * * What conditions will allow entry into 0POP05-EO-FRH2?
* *Pressure in ≥ 1 SG ≥ 1325 psig** * Highest SG Safety*
47
* 0POP05-EO-EC01 Loss of All AC Power w/o SI Required* * * * How many CCW trains are required to provide cooling to SFP?
**Two Trains** * * * * First train for RCS. Second Train for SFP. * Must consult with TSC if only one train available.
48
* 0POP05-EO-EC11 Loss of Emergency Coolant Recirc* * * * What are the SI Termination criteria in 0POP05-EO-EC11?
*_RVWL Plenum Level:_* **NO RCPs: ≥ 20% RCPs: ≥ 85%** **_AND_** **Subcooling \> 85 ˚F [95 ˚F]** * * * If you cannot secure, establish minimum SI flow per Addendum 5.
49
* 0POP05-EO-FRS1 Response to ATWS* * * * How much AFW Flow is required if SGNR Level is ≤ 14% [34%] in _ALL_ SGs while in 0POP05-EO-FRS1?
**1080 gpm**
50
* 0POP05-EO-FRP1 Response to Iminent BFPL* * * * Why does the first step in 0POP05-EO-FRP1 check for a large break LOCA?
**Purpose of this procedure is to prevent a LOCA** **No point in performing this procedure** * * * * Step has you check to see of LHSI is injecting. * \< 415 psig _AND_ \> 500 gpm flow
51
* 0POP05-EO-EC01 Loss of All AC Power w/o SI Required* * * * When the operators finish with 0POP05-EO-EC01, what procedure will they transition to?
*_With RCP:_* **0POP03-ZG-0007** Plant Cooldown *_With No RCP AND Letdown:_* **0POP05-EO-ES02** Natural Circulation Cooldown *_With No RCP AND NO Letdown:_* **0POP05-EO-ES05** Natural Circulation Cooldown w/o Letdown
52
* 0POP05-EO-EC00 Loss of All AC* * * * How long can the unit be without AC power before it is considered an ELAP?
**4 hrs**
53
* 0POP05-EO-ES33 Post-SGTR Cooldown Using Steam Dump* * * * How does the operator dump steam from the ruptured SG in 0POP05-EO-ES33?
* _Condenser Available:_* * *Throttle open MSIBs of intact SGs** **Use Steam Dumps to lower ruptured SG Pressure to \< 332 psig** * _Condenser NOT Available:_* * *Use ruptured SG PORV to lower ruptured SG Pressure to \< 332 psig** * * * Using SG PORV is a unmonitored release to the public (Last Resort)
54
* 0POP05-EO-FRH1 Response to Loss of Secondary Heat Sink* * * * What parameters are checked to determine if a secondary heat sink is required?
**RCS Pressure \> Non-Faulted SG Pressure** * *WR HL \> 350 ˚F** * RHR Conditions*
55
* 0POP05-EO-FRC1 Response to Inadequate Core Cooling* * * * 0POP05-EO-FRC1 requires the operator to start 3 trains of SI Pumps. If a HHSI / LHSI pump does not start, what does the procedure have the operator do?
**Start both CCPs with MAX Charging. (240 gpm/CCP)** **If CCP not available, start PDP also.**
56
* 0POP05-EO-FRH3 Response to SG High Level* * * * What conditions will allow entry into 0POP05-EO-FRH3?
**SGNR ≥ 87% [60%] in ≥ 1 SG** ## Footnote * * * Can also enter from 0POP05-EO-FRH2 Response to SG Overpressure if SGNR \> 91% [71%].
57
* 0POP05-EO-FRC2 Response to Degraded Core Cooling* * * * What conditions will allow entry into 0POP05-EO-FRC2?
**Subcooling ≤ 35 ˚F [45 ˚F] _AND_ RVWL Plenum \< 20% _AND_ CETs ≥ 708 ˚F**
58
* 0POP05-EO-EC02 Loss of All AC Power w/ SI Required* * * * What is unique about the SI Termination Criteria in 0POP05-EO-EC02?
**_IF_ aligned for CL Recirc _AND_ RCS Pressure \> Shutoff Head for Pump _THEN_ Turn off pump** ## Footnote * * * No Mini Flow Protection.
59
* 0POP05-EO-ES03 Natural Circulation C/D with Voids* * * * What conditions prevent the operator from transitioning to 0POP05-EO-ES03?
**Any Faulted OR Inactive SGs**
60
* 0POP05-EO-ES02 Natural Circulation C/D* * * * At what SG level should you not restore AFW Flow?
**≤ 13 % WR Level** ## Footnote * * * Contact TSC for recovery actions.
61
* 0POP05-EO-EO30 SG Tube Rupture* * * * What ruptured SG pressure would be indicative of a LOCA and require entry into 0POP05-EO-EC31?
**≤ 468 psig**
62
* 0POP05-EO-E010 Loss of Rx or Secondary Coolant* * * * When do the operators transition to HL Recirculation?
**5.5 Hours** ## Footnote * * * At 4.5 Hours after event initiation, the operators will begin to prepare.
63
* 0POP05-EO-EC33 SGTR w/o PZR Pressure Control* * * * What are the SI reinitiation criteria for 0POP05-EO-EC33?
* _RCS Subcooling:_* * *\< 35 ˚F [45 ˚F]** * _RCS Inventory:_* * *RVWL Plenum \< 85%**
64
* 0POP05-EO-FRC2 Response to Degraded Core Cooling* * * * If all RCPs are running in 0POP05-EO-FRC2, what does the procedure direct the operator to do?
**Stop RCP 1D** ## Footnote * * * Save for PZR spray
65
* 0POP05-EO-ES02 Natural Circulation C/D* * * * What subcooling margin should be maintained while performing a C/D in 0POP05-EO-ES02?
**≥ 80 ˚F Subcooling** ## Footnote * * * Utilize Max Quad TC Ave for Addendum 1 and _NOT_ Qual PAMS subcooling indication. * * * *Note: Same as 0POP05-EO-ES05 Natural Circ C/D w/ Loss of letdown.*
66
* 0POP05-EO-E010 Loss of Rx or Secondary Coolant* * * * How long does the operator have to depressurize the intact SGs to \< 1000 psig and lower their PORV setpoints?
**45 Mins** * * * Prevents exceeding peak clad temperature limit (2200 ˚F) * Ensures HHSI pumps are injecting
67
* 0POP05-EO-EC21 Uncontrolled Depress of all SGs* * * * What is unique about the SI termination criteria in 0POP05-EO-EC21?
**HHSI pumps have become your heat sink**
68
* 0POP05-EO-EO30 SG Tube Rupture* * * * You have finished the C/D of 0POP05-EO-EO30 and the procedure has you check ruptured SG pressure controlled or rising. What ∆P between intact and ruptured SGs would be indicative of a LOCA and require entry into 0POP05-EO-EC31?
**Ruptured SG \< 250 psig above Intact SG** ## Footnote * * * Ruptured SG should be isolated and not used for C/D. Therefore its pressure should remain high while intact SGs should have dropped. If ruptured SG pressure is lower (i.e. RCS pressure dropped quickly), then you have indications of a LOCA. * * * *Note: Also have indication of LOCA on next step. Check Subcooling \> 55 ˚F [65 ˚F]*
69
* 0POP05-EO-EO00 Rx Trip or SI* * * * What EOPs have the following RCP Trip Criteria? * HHSI Pump - At least one running * RCS Pressure - \< 1430 psig
* _Active During Entire Procedure:_* * *0POP05-EO-EO00** * Rx Trip or SI* * *0POP05-EO-EO10** * Loss of Primary or Secondary Coolant* * *0POP05-EO-ES00** * Rediagnosis* * * * *_Active Before C/D:_* * *0POP05-EO-EO30** * SG Tube Rupture* * *0POP05-EO-ES12** * Post LOCA C/D and Depress*
70
* 0POP05-EO-ES03 Natural Circulation C/D with Voids* * * * What conditions must be met prior to starting a RCP with voids in the vessel?
**PZR Level ≥ 95% [98%]** **Subcooling ≥ 77 ˚F [92 ˚F]**
71
* 0POP05-EO-FRH3 Response to SG High Level* * * * How does the operator lower SG level in 0POP05-EO-FRH3?
**Isolate MFW** **Isolate AFW** **Establish Blowdown** * * * * Do not release steam if affected SGNR \> 91% [71%] until TSC evaluation performed. * Only exception is the terry turbine if it is the only source of feed.
72
* 0POP05-EO-EC00 Loss of All AC* * * * Why do the operators stop depressurizing the intact SGs at 405 psig?
**Accumulators will not inject if SG Pressures \> 305 psig (100 psig margin)** ## Footnote * * * Will also stop depress if RCS CL \< 274 ˚F (Integrity CSF)
73
* 0POP05-EO-EC11 Loss of Emergency Coolant Recirc* * * * If you are in 0POP05-EO-EC11, how many trains of SI should be running at most?
**One Train**
74
* 0POP05-EO-EO00 Rx Trip or SI* * * * What procedure will EO00 kick you out to if you can not isolate the PZR PORV in Step 9?
**0POP05-EO-EO10 Loss of Rx or Secondary Coolant** ## Footnote * * * Monitor Critical Safety Functions and when Addendum 5 Complete Implement
75
* 0POP05-EO-EO00 Rx Trip or SI* * * * If a LOOP or SI occurs and a train of essential chilled water fails, how long does the operator have to secure that train's EAB HVAC fans?
**30 Mins** ## Footnote * * * Prevents EAB HVAC fans from adding heat to the Aux S/D room and the QDPS rooms.
76
* 0POP05-EO-EC33 SGTR w/o PZR Pressure Control* * * * While performing the RCS cooldown in 0POP05-EO-EC33, PZR pressure control is re-established and PZR level is restored to \> 8% [44%]. What should the operator do?
**Transition to 0POP05-EO-EO30 Step 31**
77
* 0POP05-EO-ES12 Post LOCA C/D and Depress* * * * If the TSC staff has determined that H2 dissolution has occured in the PZR reference leg, what is the minimum PZR level that heaters can be re-energized?
**PZR Level \> 36%**
78
* 0POP05-EO-FRC1 Response to Inadequate Core Cooling* * * * Why does 0POP05-EO-FRC1 have the operator depress intact SGs to \< 305 psig?
**To allow Accumulators and LSHI pumps to inject.**
79
* 0POP05-EO-EC00 Loss of All AC* * * * How long does the operator have to de-energize the Train A Sequencer during a station blackout?
**30 Min** ## Footnote * * * Accomplished with Addendum 4 Vital Bus Monitoring.
80
* 0POP05-EO-FRH1 Response to Loss of Secondary Heat Sink* * * * What is required for adequate feed and bleed?
*_Feed:_* **Two (2) HHSI One (1) CCP** * _Bleed:_* * *Two (2) PZR PORVs**
81
* 0POP05-EO-FRH4 Response to Normal Steam Release Capabilities* * * * How does the operator lower SG pressure in 0POP05-EO-FRH4?
**SG PORVs** * *Steam Dumps** * Open MSIV or MSIB*
82
* 0POP05-EO-EC12 LOCA Outside Containment* * * * What procedure will the operators transition to once 0POP05-EO-EC12 is complete?
*_RCS Pressure Rising:_* **0POP05-EO-EO10** Loss or Rx or Secondary Coolant * _RCS Pressure Lowering:_* * (Unable to isolate leak)* **0POP05-EO-EC11** Loss of Emergency Coolant Recirc
83
* 0POP05-EO-EO00 Rx Trip or SI* * * * What is the only casualty that will allow you to get past steps 12-14 in EO00?
**LOCA outside of containment** ## Footnote * * * Must of had SI and conditions are not met for step 14 in EO00 to kick you out to EO10. * * * *Note: Step 24 or 25 will eventually kick you out to 0POP05-EO-EC12 LOCA outside Containment.*
84
* 0POP05-EO-EC00 Loss of All AC* * * * What is the basis of ensuring RCS TC \< 360 ˚F within 10 hrs of a loss of all AC?
* *Will preclude RCP #1 Seal surface corrosion** * Could result in excessive leakage*
85
* 0POP05-EO-EC00 Loss of All AC* * * * What kind of valves are the AFW OCIVs, AFW Reg Valves, and AFW X-Connects?
*_AC MOVs:_* **A,B,C AFW OCIVs A,B,C AFW Reg Valves** *_DC MOVs:_* **D AFW OCIV D AFW Reg Valve** * _AOVs:_* * *All AFW X-Connects**
86
* 0POP05-EO-FRH2 Response to SG Overpressure* * * * How does the operator lower SG pressure in 0POP05-EO-FRH2?
* _SG D ONLY:_* * *Terry Turbine** * _All Affected SGs:_* * *SG PORVs** * _All Unaffected SGs:_* * *Dump Steam to lower RCS HL\< 555 ˚F [550 ˚F]** * * * If affected SG PORV will not open, procedure has you open MSIBs to X-Conn SGs. * * * * Note: * *_DO NOT DUMP STEAM IF SGNR \> 91% [71%]_**. Need TSC Evaluation. Should enter 0POP05-EO-FRH3 Response to SG High Level.*
87
* 0POP05-EO-EO30 SG Tube Rupture* * * * If the ruptured SG is also faulted, should you restore AFW flow if SGNR level drops below 14% [34%]?
**No** ## Footnote * * * Caution statement before step 4 gives you an out.
88
* 0POP05-EO-FRC1 Response to Inadequate Core Cooling* * * * What conditions allow the operator to exit 0POP05-EO-FRC1 and transition to 0POP05-EO-EO10?
**CETs \< 1200 ˚F** **Two (2) RCS HL \< 350 ˚F** **RVWL ≥ 20%** * * * Need a HHSI with flow indicated _OR_ a LHSI with flow to transition to EO10. Otherwise puts you in a loop or bypasses this step.
89
* 0POP05-EO-EC11 Loss of Emergency Coolant Recirc* * * * If you are unable to meet the SI termination criteria in 0POP05-EO-EC11, the procedure will direct you to Addendum 5 Minimum SI Flow. What are the high level steps of this Addendum?
**Check RCS \< 415 psig** No: Secure LHSI and exit procedure. *After this step should only have 1 HHSI _OR_ 1 LHSI* **Stop HHSI** **Open Mini Flow Valves for running LHSI** * *Establish Min Flow Using Chart** * Done by closing RHR HX Bypass and throttling TCV*
90
* 0POP05-EO-ES11 SI Termination* * * * How do you reset P4 Logic?
**Close Rx Trip Breakers** **Open Rx Trip Breakers**
91
* 0POP05-EO-FRC1 Response to Inadequate Core Cooling* * * * What conditions will allow entry into 0POP05-EO-FRC1?
**CETs ≥ 1200 ˚F**
92
* 0POP05-EO-FRH5 Response to SG Low Level* * * * What conditions will allow entry into 0POP05-EO-FRH5?
**SGNR ≤ 14% [34%] in ≥ 1 SGs**
93
* 0POP05-EO-ES01 Rx Trip Response* * * * What is the purpose of arming the steam dumps in steam pressure control if no RCPs are running in 0POP05-EO-ES01?
**Need dumps for a Heat Sink for Natural Circulation**
94
* 0POP05-EO-ES01 Rx Trip Response* * * * What procedure will the operators transition to cool down the plant after performing 0POP05-EO-ES01?
* _With RCPs:_* * *0POP03-ZG-0007 Plant Cooldown** * _With No RCPs:_* * *0POP05-EO-ES02 Natural Circulation Cooldown** * _With No RCPs AND No Letdown:_* * *0POP05-EO-ES05 Natural Circulation Cooldown w/ Loss of Letdown**
95
* 0POP05-EO-E010 Loss of Rx or Secondary Coolant* * * * What procedure do you transition to if you have a small break LOCA?
**0POP05-EO-ES12** Post LOCA C/D and Depress * * * *_Transition Criteria:_* RCS Pressure \> 415 psig (LHSI Shutoff Head) _OR_ RCS ≤ 415 psig AND LHSI Flow ≤ 500 gpm
96
* 0POP05-EO-EC31 SGTR w/ LOCA - Subcooled Recovery* * * * What conditions will send the operator to 0POP05-EO-EC32?
* *RWST Level ≤ 50%** * Must use Addendum 6 to take into account containment water level also* * *Ruptured SGNR Level ≥ 91% [71%]** * TSC has a buy in*
97
* 0POP05-EO-ES31 Post SGTR C/D using Backfill* * * * If a LOCA occurs while performing 0POP05-EO-ES31, what procedure will you transition to?
* *0POP05-EO-EC31** * SGTR w/ Loss of Rx Coolant - Subcooled Recovery Desired* ## Footnote * * * Will also start SI pumps per CIP. * * * *Note: Will not transition to 0POP05-EO-EO10 due to LOCA w/ a SGTR.*
98
* 0POP05-EO-FRS2 Response to Loss of Core S/D* * * * What conditions will allow entry into 0POP05-EO-FRS2?
**Extended Range Flux ≥ 5x10-6 % _AND_ SUR 0 DPM to -0.2 DPM** **_OR_** **Extended Range Flux \< 5x10-6 % _AND_ (+) SUR**
99
* 0POP05-EO-EC02 Loss of All AC Power w/ SI Required* * * * When can FRPs be implemented in 0POP05-EO-EC02?
**After Step 11** ## Footnote * * * First 11 steps are a mini Addendum 5 to verify SI actuated as designed.
100
* 0POP05-EO-ES13 Transfer to CL Recirc* * * * What is the minimum LHSI flow required by 0POP05-EO-ES13?
**800 GPM** * * * If due to high RCS pressure: * Maintain One PZR PORV Open.
101
* 0POP05-EO-ES01 Rx Trip Response* * * * While in 0POP05-EO-ES01, what conditions require the operator to emergency Borate?
* *RCS temperature \< 550 ˚F** * Secure when RCS Temperature ≥ 550 ˚F _OR_ RCS Cb \> 2800 ppm* **≥ 2 Rod bottom lights _NOT_ Lit** Emergency Borate _940 Gal for each rod ≤ 18 Steps_ Emergency Borate _4460 Gal for each rod \> 18 Steps_ _OR_ Borate to RCS Cb \> 2800 ppm * *Loss of DRPI** * Borate until DRPI restored _OR_ RCS Cb \> 2800 ppm*
102
* 0POP05-EO-EC00 Loss of All AC* * * * When must the operator commence filling the AFWST with FPS?
**AFWST Level \< 138,000 (26%) _AND_ Cannot fill with 0POP02-AF-0001**
103
* 0POP05-EO-EO00 Rx Trip or SI* * * * What conditions require the operator to isolate the MSR cooldown path in EO00?
**Any MSIV or MSIB not shut w/ LOOP _OR_ IA Pressure \< 95 psig** ## Footnote * * * *Note: MSR valves will fail open on Loss of power or air and do not want excessive C/D.*
104
* 0POP05-EO-ES03 Natural Circulation C/D with Voids* * * * What must be done when entering MODE 4 to satisfy tech specs?
**Place 2 HHSI pumps in PTL** **Place 1 CCP in PTL** **Place PDP in PTL**
105
* 0POP05-EO-FRS1 Response to ATWS* * * * What is the preferred source of emergency boration in 0POP05-EO-FRS1?
**BAT Tanks** ## Footnote * * * Will get more Boron in RCS with less inventory added.
106
* 0POP05-EO-FRH1 Response to Loss of Secondary Heat Sink* * * * When is feed and bleed required?
**Two (2) SGs WR Level \< 50% [73%]** **_OR_** **PZR Pressure \> 2335 psig** * * * Feed and bleed should not be initiated if SG low level caused by depressurizing the SGs to allow fire water to be used (Addendum 8) unless _CETs \> 567 ˚F and rising_.
107
* 0POP05-EO-ES02 Natural Circulation C/D* * * * While performing a C/D in 0POP05-EO-ES02 with an inactive SG, how do you prevent the inactive SG from becoming a heat source to the RCS?
**Maintain Inactive SG 200 - 300 psig above Active SG Pressure** ## Footnote * * * SG PORV limited to 10% open during C/D.
108
* 0POP05-EO-EO30 SG Tube Rupture* * * * When will the operator secure depressurizing the RCS in 0POP05-EO-EO30?
**RCS Pressure \< Ruptured SG Pressure PZR Level \> 8% [44%]** **_OR_** **PZR Level \> 70%** **_OR_** **RCS Subcooling \< 35 ˚F [45 ˚F]** **_OR_** *_PZR SPRAY ONLY_* **RCS / Ruptured SG ∆P \< 300 psid PZR Level \> 38% [50%]**
109
* 0POP05-EO-EO00 Rx Trip or SI* * * * What values put you in adverse containment conditions?
**Containment Pressure ≥ 5 psig \*\*** **Containment Radiation Levels ≥ 105 R/hr**** **Containment Integrated Dose ≥ 106 R** * * * *Note: If Pressure or Radiation Levels drop back below values, then adverse containment may be exited.*
110
* 0POP05-EO-EC00 Loss of All AC* * * * What must be done if CET \> 1200 ˚F while in 0POP05-EO-EC00?
*_CET \> 1200 ˚F_* **Notify TSC and Emergency Director Go To SAMG with Emergency Director Concurrence** * _CET \> 708 ˚F_* * *Notify TSC and Emergency Director**
111
* 0POP05-EO-FRH1 Response to Loss of Secondary Heat Sink* * * * What are the SG Feed flow criteria on the CIP of 0POP05-EO-FRH1?
* _SGWR Level \> 13% [37%]:_* * *Any AFW Flow** * * * * *_Bleed and Feed in Progress_** * *_ALL SGs SGWR Level ≤ 13% [37%]_** *_RCS WR Th ≤ 550˚F OR \> 550 ˚F w/ CETs Stable / Lowering_* **Restore AFW to One (1) SG [100 gpm]\*\*** *_RCS WR Th \> 550 ˚F w/ CETs Rising_* **Establish MAX Flow to One (1) SG\*\*** * * * * _WHEN_ SGWR \> 13% [37%] _AND_ RCS WR Th ≤ 550 ˚F * _THEN_ Any AFW Flow
112
* 0POP05-EO-EC01 Loss of All AC Power w/o SI Required* * * * When can FRPs be implemented in 0POP05-EO-EC01?
* *After Step 11** * By that time you have control of plant and SI back in AUTO*
113
* 0POP05-EO-ES05 Natural Circulation C/D w/ Loss of Letdown* * * * What is unique of about the AFW flow / Heat sink requirements in 0POP05-EO-ES05?
* *SG NR Level \> 14% in _TWO_ SGs** * Normally requires 1 SG* **_OR_** **Total AFW Flow \> 576 gpm** * * * Basis: Has something to do with fire hazard analysis in FSAR. * * * *Note: If you do not have 2 SG's available for C/D, Use Addendum 7 Establish DA Vent Path.*
114
* 0POP05-EO-FRH4 Response to Normal Steam Release Capabilities* * * * What conditions will allow entry into 0POP05-EO-FRH4?
* *SG Pressure in ≥ 1 SG ≥ 1285 psig** * Lowest Safety Setting*