After a fuel handling accident, how long does an operator have to place a train of CRE HVAC in emergency mode?

2 hrs

How long can a SGFPT be operated at 5500 - 5600 RPM?

1 hr maximum
Individual SGFP flow shall be greater than 11,000 gpm

What is an unauthorized discharge of oil?
Harmful quantity of oil from site into coastal waters or threatens to enter coastal waters within 12 hrs.

Harmful quanity of oil is sufficient to create a visible film / sheen or cause sludge buildup beneath the water
Note:
Discharge into Main Cooling Reservoir does NOT constitute an unauthorized discharge
If power is lost to all ESF busses, then an operator must be sent to shed the Channel I sequencer. How long does the operator have to perform this action?

30 mins

What are the important values of main condenser vacuum? (i.e. alarms, actuations, ect.)

Standby CARS pump starts

If power is lost to the 250VDC switchboard, the turbine trips, and a LOOP occurs at the same time, what must the operator do?

Depressurize the MG within 2 hrs

What must be done if main turbine vacuum is < 21” Hg?

Ensure Rx Tripped
Ensure Turbine Tripped
Perform 0POP05-EO-EO00

What must the operator do if only 1 Source Range / Extended Range NI is OPERABLE?

Suspend Core Alterations
Suspend Operations that would dilute RCS < LCO 3.9.1
Borate to .95 Keff

What must RCS temperature be less than in order to run the RHR pumps without seal cooling?

< 120 ˚F

What are your actions if the plant is in MODES 3-5 and both extended range NIs are lost?

Suspend positive reactivity changes [Immediately]
Isolate unborated water paths from RMW system to RCS [15 mins]
Restore 1 channel to OPERABLE [1 hr]
OR
Secure unborated water sources [2 hrs]
AND
Verify SDM [4 hrs and 12 hrs after]

When a fire or explosion occurs in the switchyard, when can plant personnel enter the switchyard?

Once Centerpoint Energy arrives and assesses the damage

Operation in what power levels is not permitted with > 1 GV out of service?

20 - 75% Power

Could result in rotor damage due to Double Shock Condition.
What must be done if the PZR spray valves fail to close?

Monitor PZR pressure
Ensure Turbine Tripped
Stop RCP 1A
Stop RCP 1D
If it continues to lower stop all but 1 RCP
Perform 0POP05-EO-EO00

What must Hot Leg level be in order to start a RHR pump?


What will the operator do, with regards to Rx Power, during a loss of all control room annunciators?

Do not downpower unless required by Tech Specs

If a Class 1E battery is realigned to an operating battery charger in ≤ 15 min AND ≤ 1 battery cell is jumpered, then what must be done to declare it OPERABLE?

Verify Operating Battery Charger normal float voltage ≥ 128.5 VDC

Note:
A Class 1E battery is INOPERABLE anytime it is NOT aligned to an operating battery charger.
What must be done if all CCW is secured and cannot be restarted?

Trip Reactor
Trip Turbine
Perform 0POP05-EO-EO00
Will also start the PDP and secure CCPs later on in the procedure.

If damage occurs to an irradiated fuel assembly during a fuel handling accident, what is the potential emergency classification?

Alert

What is the load restriction on each winding of the emergency transformer?

2762 KW / winding
Note:
If only 1 ESF bus is available and it will be loaded on emergency transformer, then load limit is N/A but must maintain > 4.0 kV on ESF bus.

What RCP Case and Shaft Vibrations would require the operator to trip the RCP?

Case Vibration:
≥ 5 mils
≥ 3 mils and rising ≥ 0.2 mils/hr

What 13.8kV / 4.16 kV busses does 0POP04-AE-0001 NOT cover?

1K
1L
1M

What must the operator do if power is lost to a RCP while in MODES 1-2?

Trip the Rx
Perform 0POP05-EO-EO00
CIP requires operator to trip the Rx even if power below P-8.

Step 2 in 0POP04-CR-0001 has you check the proper number of CW pumps are running. What determines the proper number of CW pumps?

2 CW Pump operation is only acceptable when starting or securing CW.
If 2 CW pump operation is required in MODES 1-2:

What flowrate must be maintained when emergency borating with the CCP?

≥ 50 gpm
Note:
50 gpm is chosen b/c 30 gpm is required by tech specs and 20 gpm is for seals