How did you identify the construction type and common defects in the Glasgow tenement block?
I reviewed the building’s age and materials, anticipated defects like damp and slate displacement, and confirmed them during inspection.
Common defects p
-bay windows not tied in to the the external wall
- breastama beam failed
- cementishus pointing
How did you recommend remedial works for damp ingress at the bay window in the Glasgow tenement?
I advised repairs to the window surrounds and stonework, and improved drainage to prevent recurrence.
How did you specify the replacement of sash and case windows in the Glasgow tenement?
I recommended timber-framed units matching the original design for heritage compliance.
How did you assess the need for roof repairs in the Glasgow tenement?
I inspected for displaced slates and water ingress, then recommended targeted repairs and maintenance.
How did you ensure compliance with Approved Document M for the Bellenden Primary School accessible WC?
I specified minimum room dimensions, fixture heights, grab rails, and color-contrasting features.
How did you select sanitary fittings for the Bellenden Primary School accessible WC?
I chose robust, easy-to-clean fittings suitable for a school environment and compliant with regulations.
How did you specify hygienic wall cladding and anti-slip flooring for the accessible WC at Bellenden Primary School?
I selected materials that are durable, easy to maintain, and provide a safe environment for users.
How did you address the needs of visually impaired users in your design for Bellenden Primary School?
I specified color-contrasting fixtures and clear signage in line with approved document M and BS 8300.
I also checked for colour contrasting colours through a Light Reflectance Value (LRV)
How did you determine the appropriate WC seat height and location of grab rails in the accessible WC?
I followed regulatory guidance and best practice for accessibility.
How did you specify the wall-hung washbasin in the accessible WC?
I ensured it was at an accessible height and provided adequate knee clearance for wheelchair users.
In a UK accessible WC (for example under Approved Document M / BS 8300 guidance) the rim height of a wall-hung wash-hand basin should be approximately 720-740 mm above finished floor level.
You’ll find these requirements in Approved Document M (Volume 1 or 2) and the Inclusive Mobility or BS 8300 guidance documents.
How did you incorporate pull cords and emergency alarms in the accessible WC design?
I engaged a electrical engineer for input and guidance on my design
How did you assess the insulation in the roof build-up at Manchester Drive?
I conducted a desktop review and found no insulation, recommending its inclusion in replacement works.
How did you specify remedial works for the uninsulated roof at Manchester Drive?
I recommended adding insulation to improve energy efficiency and comply with regulations.
How did you ensure your recommendations for the Glasgow tenement were in line with best practice?
I referenced industry standards and guidance for traditional buildings.
How did you stay updated on waterproofing and tanking methods?
By attending CPD events and reviewing technical literature.
How did you identify the need for low carbon heating sources in your projects?
The clients requirements, funding requirements and if it alines with the clients brief and budget
How did you specify accessible features for staff and pupils with additional needs at Bellenden Primary School?
By including features like grab rails, color contrast, and accessible fixtures.
How did you coordinate with M&E engineers for the accessible WC at Bellenden Primary School?
I worked with them to ensure lighting, ventilation, and power were integrated with the layout.
How did you document your recommendations for remedial works in the Glasgow tenement?
I provided a detailed report with photographs and prioritized actions.
How did you ensure your specifications for Bellenden Primary School were practical for daily use?
By consulting with school staff and considering operational needs.