Construction Tech - Level 2 Flashcards

(22 cards)

1
Q

How did you identify the construction type and common defects in the Glasgow tenement block?

A

I reviewed the building’s age and materials, anticipated defects like damp and slate displacement, and confirmed them during inspection.

Common defects p
-bay windows not tied in to the the external wall
- breastama beam failed
- cementishus pointing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

How did you recommend remedial works for damp ingress at the bay window in the Glasgow tenement?

A

I advised repairs to the window surrounds and stonework, and improved drainage to prevent recurrence.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

How did you specify the replacement of sash and case windows in the Glasgow tenement?

A

I recommended timber-framed units matching the original design for heritage compliance.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How did you assess the need for roof repairs in the Glasgow tenement?

A

I inspected for displaced slates and water ingress, then recommended targeted repairs and maintenance.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How did you ensure compliance with Approved Document M for the Bellenden Primary School accessible WC?

A

I specified minimum room dimensions, fixture heights, grab rails, and color-contrasting features.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How did you select sanitary fittings for the Bellenden Primary School accessible WC?

A

I chose robust, easy-to-clean fittings suitable for a school environment and compliant with regulations.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

How did you specify hygienic wall cladding and anti-slip flooring for the accessible WC at Bellenden Primary School?

A

I selected materials that are durable, easy to maintain, and provide a safe environment for users.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How did you address the needs of visually impaired users in your design for Bellenden Primary School?

A

I specified color-contrasting fixtures and clear signage in line with approved document M and BS 8300.

I also checked for colour contrasting colours through a Light Reflectance Value (LRV)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

How did you determine the appropriate WC seat height and location of grab rails in the accessible WC?

A

I followed regulatory guidance and best practice for accessibility.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

How did you specify the wall-hung washbasin in the accessible WC?

A

I ensured it was at an accessible height and provided adequate knee clearance for wheelchair users.

In a UK accessible WC (for example under Approved Document M / BS 8300 guidance) the rim height of a wall-hung wash-hand basin should be approximately 720-740 mm above finished floor level.

You’ll find these requirements in Approved Document M (Volume 1 or 2) and the Inclusive Mobility or BS 8300 guidance documents.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

How did you incorporate pull cords and emergency alarms in the accessible WC design?

A

I engaged a electrical engineer for input and guidance on my design

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

How did you assess the insulation in the roof build-up at Manchester Drive?

A

I conducted a desktop review and found no insulation, recommending its inclusion in replacement works.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

How did you specify remedial works for the uninsulated roof at Manchester Drive?

A

I recommended adding insulation to improve energy efficiency and comply with regulations.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

How did you ensure your recommendations for the Glasgow tenement were in line with best practice?

A

I referenced industry standards and guidance for traditional buildings.

  • historic environment Scotland
  • The tenement handbook
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

How did you stay updated on waterproofing and tanking methods?

A

By attending CPD events and reviewing technical literature.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

How did you identify the need for low carbon heating sources in your projects?

A

The clients requirements, funding requirements and if it alines with the clients brief and budget

17
Q

How did you specify accessible features for staff and pupils with additional needs at Bellenden Primary School?

A

By including features like grab rails, color contrast, and accessible fixtures.

18
Q

How did you coordinate with M&E engineers for the accessible WC at Bellenden Primary School?

A

I worked with them to ensure lighting, ventilation, and power were integrated with the layout.

19
Q

How did you document your recommendations for remedial works in the Glasgow tenement?

A

I provided a detailed report with photographs and prioritized actions.

20
Q

How did you ensure your specifications for Bellenden Primary School were practical for daily use?

A

By consulting with school staff and considering operational needs.