What must be verified to ensure that fire and life safety requirements are met during construction?

A

Site access

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Which type of view contains information about the exterior components of a building such as the type of exterior finish?

A

Elevation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Manufacturer’s product submittal information sheets are also called:

A

cut sheets.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Which type of plan provides specific details about building components such as external walls, internal walls and partitions, and fire separation walls?

A

Floor plan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Which of the following makes inspector site visits more efficient and effective?

A

Coordinating inspections with completion dates

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Which of the following verifies occupancy classification is consistent with the intended use of the structure?

A

Inspector or plans examiner

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Which of the following determines the manner in which plans are handled or routed through the review process?

A

Local jurisdictions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Submitted plans need to have all the information necessary to:

A

evaluate compliance with the locally adopted code.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Which of the following is used to indicate a door’s direction of swing?

A

Arc

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

For which building system plans should an inspector determine the location of hose cabinets or discharges?

A

Automatic sprinkler

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Fire detection and alarm systems are designed to meet requirements found in:

A

NFPA® 72National Fire Alarm Code®.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Which type of view is a vertical view of a building as if it were cut into two parts?

A

Sectional

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Which of the following is the BEST reason for agencies charging a fee to review construction documents?

A

Defray administrative costs associated with the review

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Which of the following are important when determining grade elevations for fire apparatus access to the site?

A

Contour lines

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

The AHJ establishes a plans review and permitting process to verify structures that are new, remodeled, or have a change in occupancy classification meet the requirements of:

A

locally adopted building and fire codes.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Which building system plans should be inspected to determine whether the water supply is adequate to support the fire protection systems in the structure?

A

Plumbing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

During which step of the plans review process are the final set of plans and documents stamped and signed to indicate official acceptance?

A

Accept

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

During which step of the plans review process is the permit to begin construction for the specific site and project issued?

A

Authorize

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Which of the following is the usual symbol for exterior walls?

A

A pair of parallel lines

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Plans examiners must evaluate the exit capacity according to:

A

the specifications of the appropriate codes.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

The inspector or plans examiner who reviews the plans:

A

may also be responsible for field verification.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

When government agencies conduct construction document review:

A

many agencies use third-party agencies to assist with the review.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

Which of the following are usually shown as broken lines marked at intervals with a letter?

A

Utility lines

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

All fire detection and alarm equipment must be listed by:

A

a nationally recognized testing agency.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
During which step of the plans review process do plans examiners from building and fire departments note corrections or alterations needed to meet code requirements?
Review
26
Which type of view has the purpose of showing the internal construction of each assembly?
Sectional
27
The primary reason local governments require construction permits and plans review is:
regard for community safety.
28
Which of the following are the first three general steps in the plans review process?
Application and submittal, review, resubmittal
29
Which statement about inspector site visits during construction is MOST accurate?
An inspector should visit the site often.
30
When occupants remain in a building during construction, and a fire detection or alarm system will be nonfunctional for any length of time:
a fire watch should be posted.
31
Which of the following is MOST likely to contribute to fire spread or smoke development?
Insulation materials
32
Which of the following is MOST likely to require that contractors be bonded and licensed?
Local jurisdiction
33
Who should the inspector notify when violations are found during a site visit?
General contractor
34
Which of the following has the responsibility of identifying the intended use of each room or section of the building?
Design professional
35
If the owner or contractor fail to follow the requirements of the building or fire code, records may be required for use in:
any legal action.
36
Which is the BEST option for preventing an owner/occupant from attempting to omit a requirement?
A team approach
37
Each means of egress must provide a:
continuous path of travel to the level of exit discharge.
38
The size of each sprinkler system is based on the:
total floor area.
39
Conducting plans review enables plans examiners to:
discover any errors or omissions in a building plan.
40
For which building system must the inspector verify the location of exit signs and the means of egress lighting?
Electrical
41
A horizontal drawing of a structure at a given level such as the basement is referred to as a(an):
floor plan.
42
At a construction site, an inspector must comply with _____ regulations or locally adopted requirements for the use of personal protective clothing and equipment.
Occupational Safety and Health Administration (OSHA)
43
Minor revisions to the plans made by the client are called:
change orders.
44
Which of the following helps prevent firefighters and emergency responders from dealing with unknown and potentially dangerous structural conditions?
Building permits
45
The last set of plans must be kept at the construction site:
until the project is completed.
46
Which of the following establishes the basis for all future inspections of a building?
Accurate and complete record keeping during plans review and field verification visits
47
Atriums and open shafts connecting two or more stories are permitted if they are provided with adequate smoke control, automatic sprinkler system protection, and:
fire barriers.
48
Which statement about procedures for accepting field changes is MOST accurate?
The authority may rest solely with the fire marshal or building official.
49
Which of the following must be considered during the plans review activities when reviewing special hazards?
Contents and processes
50
Which of the following are general elements that should be reviewed in a systematic plans review?
Occupancy classification and means of egress
51
Who is responsible for verifying that construction activities conform to the plans approved by the plans examiner and issued as part of the permit documents?
Inspector
52
Which of the following usually establishes the exact manner in which plans must be submitted for review?
Authority having jurisdiction
53
When does a plans examiner verify occupant load?
Before evaluating the life safety and fire protection features of a building
54
Which of the following is the first step in evaluating documents?
Review the overall size of the building in terms of height and area
55
Working drawings should have a(an) _____ that contains specific information about the drawing and the project.
title block
56
Which type of view provides additional information in a larger scale?
Detailed
57
Which building systems are MOST likely to spread fire and smoke?
Mechanical
58
Which type of plan is usually one of the first sheets of a set of construction drawings and relates information needed to locate the building?
Site plan
59
For which building system plans must the plans reviewer classify the hazard before the review?
Automatic sprinkler
60
The theory behind building compartmentation is to limit any fire and resulting products of combustion to:
one area of a building.
61
For which building system plans should the type of expellant gas and storage container size be documented?
Special-agent fire extinguishing
62
On construction drawings, abbreviations and symbols are widely used and plans reviewers:
should be familiar with some of the more commonly used abbreviations and symbols.
63
When do codes often permit less stringent requirements for interior finishes?
When automatic sprinkler systems are installed