Level 1 - MMC
What are the advantages of off-site construction?
Level 1 - MMC
What are the disadvantages of off-site construction?
Level 1 - RIBA
Name the RIBA stages?
Level 1- Tendering
At what RIBA stage would you conduct a tender?
Level 3 - Masons Yard
Masons yard - Why did you recommend timber frame over a steel frame structure?
Closet wing -
* Requirement to gain best value and time
* Time savings to programme which then resulted in reduced preliminary cost.
* Reduced foundation size as timber frame has lower bearing capacity, resulting in reduced subs costs.
* Use of sustainable material
Level 2 - Masons Yard
How did you have report the time and cost impact of the different design solutions?
My cost plan;
* presented a estimate on the alternative proposal
* Made recommedation
How have you liaised with specialists and consultants to develop project specific design and construction solutions?
Level 2 - Masons Yard
Masons yard - Other than time and cost what other considerations were made on practical alternatives specified by the professional team?
Level 1 - Advantages
What are the Advantages of a timber frame?
Level - Disadvantages
What are the disadvantages of a timber frames?
Level 1 - Masons Yard
How can wet/dry rot and decay risks be mitigated from timber frames?
Level 2 - Masons Yard
Mason’s Yard - What considerations did you have to make regarding the automation AOV/ hatch?
Level 2 - Masons Yard
What were the implications of proposing an AOV instead of the glass box?
*Additional electrical provisions
* Reduced requirement for steel roof members
Level 2 - Essex Lodge
How did you include/account for the telescopice vents in your BoQ production?
Level 1 - Telescopic vents
What is the purpose of telescopic vents?
Level 1 - Legislation
Where governs the minimum requirement for suspended floor design?
Level 2 - BoQ
Name items you considered when measuring the steel frame at Essex Lodge and their unit of measurement?
Level 1
How is steel protected from fire?
Level 1 - MMC
Names some MMC?