Which phase of project management is Scope Management process
Executing
Monitor & control
Planning
Closing
Planning
Which are the six scope management processes?
Plan scope management
Collect requirements
Define scope
Create WBS
Validate scope
Control scope
Which 3 process during project scope management work together to outline the details
Collect requirements
Define scope
Creates WBS
Scope management plan
Create all scope related deliverables needed
Documents the specific scope documents and processes
There are 4 topics covered in Scope Management Plan. Which are they ?
Scope statement
Work breakdown structure (WBS)
Scope Baseline
Customer Acceptance Criteria
What is a requirements traceability matrix (RTM) ??
A tracker used to manage and track business requirements such as:
Functional requirements
Technical requirements
Testing requirements
Nonfunctional requirements
In a scope stament what should be included
Project and scope need to be include
Is a tree format chart that allows you to show how ur overarching project goals branches off into smaller and smaller deliverables.
Work breakdown structures
The scope baseline requires 3 things
What are they ?
Approved scope statement
Work Breakdown Structure
WBS dictionary
This is the unauthorized and uncontrolled expansion of product or project scope without adjustments to time, cost or resources.
It should be avoided at all cost and you must establish controls to monitor and prevent it
Scope creep
What causes scope creep??
Lack of control
People factors
When scope validation should occur ?
Finalizing scope baseline
During a project planning meeting a senior stakeholder requests that all project deliverables be clearly defined to prevent scope creep. What tool should you use to break down the project into smaller, manageable components??
-Work Breakdown Structure
-Scope statement
-Risk register
-Project Chapter
Work breakdown structure: decomposes project deliverables into smaller, manageable parts,ensuring better control over scope
During planning phase of the project what are the scope management processes involved??
Plan scope management
Collect requirements
Define scope
Creates WBS
During the phase Monitoring and Controlling what are the scope management processes involved?
Validate the scope
Control scope
Control account or planning package are found in ________?
Validate scope
Define scope
Planning the scope
WBS
Collecting requirements
WBS
It is a tool that allows a project manager to collect and analyze work ( remember the WBS we did )
What tool and technique is used in WBS ??
Meetings
Project Information System
Decomposition
Issue log
Decomposition: used to break down the work of the project into smaller pieces
What are some of the guidelines that should be followed when creating a WBS??
Should be created by PM using input from the team and other stakeholders, each level of a WBS is breakdown of the previous level.
What steps are taken when scope is needed but it isn’t in the baseline ???
A change has to be formally approved through the integrated control process and a new item needs to be added to the WBS, WBS dictionary and project scope statement to show the scope addition
What is the key output of the create WBS process?
The key output to the WBS process is the scope baseline, which encompasses the WBS, WBS dictionary and the project scope statement.
Is a tool used to validate Scope that includes measurements,reviews and possible formal audits ?
Inspections
There are two types of data analysis techniques used during Control Scope.What are they?
Variance analysis
Trend analysis
Which of the following should be included in your WBS?
-All resources to perform the work
-All cost to complete the work
-All activities associated with each package
-All product and project work
All product and project work
Which of the following is not a component of the scope baseline ?
-Scope Management Plan
-Scope statement
-WBS
-WBS dictionary
Scope Management Plan