Mode 1
Power operation
>5 % rated thermal power
Mode 2
Startup
< or = to 5% rated thermal power
Mode 3
Hot standby
> or = 350 degrees
Mode 4
Hot shutdown
350>Tavg>200 degrees
Mode 5
Cold shutdown
< or = to 200 degrees
Mode 6
No mode
Entered as soon as one reactor vessel head closure bolt is less than fully tensioned
LCO 3.0.3
Mode 3 within 7 hours
Mode 4 within 13 hours
Mode 5 within 37 hours
4 LCO 3.0.4.b exceptions
LTOP
ECCS high head (SI)
AFW
AC electrical
LCO 3.0.6
If a piece of equipment is inop due only to a support system, then only enter the support system LCO, there are a few exceptions
SR 3.0.1
If you cant meet the surveillance, then enter the LCO
SR 3.0.2
Allows 1.25 times the interval specified as the frequency.
Does not apply for frequencies specified as “once” or the first time.
SR 3.0.3
If a surveillance was not performed within its specified frequency, then you have up to 24hours, or the limit of the frequency.
(5 year frequency, missed, gives you 5 years to perform it.)
SR 3.0.4
I can only change MODEs when all surveillances have been met within their specified frequency.