ITS 3.1.1 Shutdown margin
SDM shall be within limits specified in the COLR
SDM not within limit then intiate boration to restore SDM within 15 minutes
Mode 2 w/Kef <1 , 3,4,5
ITS 3.1.4 Rod Group Alighment LImits
All Shutdown Rods shall be operable.
AND
Bank Demand postions ≥200 steps shall be within 15inches of bank demanded position
Bank demand postion <200 steps shall be within 7.5inches of the average of the individual rod positions in the bank.
Modes 1,2
ITS 3.1.5 Shutdown Bank Insertion limits
Each shutdown bank shall be within the insertion limits specified in the COLR
One or both banks not within insertion limits then: Verify SDM within limits/borate/restore SDM all within 1 hour
Modes 1,2 w/any control bank not fully inserted
ITS 3.2.3 Axial Flux Difference
AFD in % flux difference units shall be maintained within the limits specified in the COLR
AFD not within limits then?
Reduce Thermal power to <50% power within 30 mins
Mode 1 ≥50%
ITS 3.2.4 QPTR
QPTR shall be ≤1.02
QPTR not within limits?
Reduce thermal power by ≥3% for every 1% QPTR is over 1.02
Mode 1 >50%
2 hours
ITS 3.3.5 Los of EDG start instrumentation
Two channels per bus for loss of voltage and 3 channels per bus for degraded grid function shall be operatble
If either condition is not met then declare EDG INOP immediately
Modes 1,2,3,4
ITS 3.3.6 Containment Ventilation Isolation Instruementation
Two trains of CV Ventilation Isolation actuation functions and logic shall be operarble
If one or more functions, with one more more manual or automatic actuation trains inop, OR one more radiation monitoring channels inope then:
CLose the CV purge supply and exhaust valves IMMEDIATELY
and
Delcare affected CIV inop IMMEDIATELY
Modes 1,2,3,4 (and when moving fuel assemblies)
ITS 3.3.7 CR emergency filtration system
Two trains of CREFS actuation functions and logic shall be operable
2 trains inop, or R-1 actuation inop, then places CR HVAC in emergency pressurization mode IMMEDIATELY
Modes 1,2,3,4 (and when moving fuel assemblies)