What airports do EDTO ops have to be?
Adequate
What cat for adequate ?
A B or C
What does adequate airport require at ETOU?
Forecast wx
Services and facilities eg. Lighting
LDA = dry LDR at LW
One instrument approach
What category for DPA?
A or B
What category for destination airport ?
Cat a or b
Takeoff alternate categories?
A, B or C
Approach fuel ?
1500’ to touchdown
What is arrival allowance for ?
Manoeuvring at the destination.
Contingency fuel up to DPA not less than the greater of :
5% of DPA to destination or DPA port
5% point of diversion to enroute alternate
5 min 1500’ ISA at destination, DPA or enroute alternate.
A330 approach fuel
500kg
A330 contingency cap
2T
A330 FRF
2700kg
Minimum planned endurance over destination
70 mins
Single Rwy outside Australia 80min
Is contingency fuel required after DPA ?
No
Is contingency fuel required for DP1, DP2, DOD or CPE calculations ?
No
EOD calculating using fuel rate at what height and environmental conditions?
1500’
ISA
ETOU time range do destination, alternate, TO alternate and DPA?
30 mins before and 30 mins after ETA
ETOU EDTO
Earliest ETA to latest ETA
FRF is 30 mins calculated using which height and environmental conditions?
1500’
ISA
Minimum fuel required in tanks for landing?
30 mins/FRF
Flight fuel is from when to when ?
Takeoff to 1500’
What is fuel planned over destination at 1500’ calculated by subtracting flight fuel and taxi fuel from fuel uplift ?
FOD
Weather holding at destination calculated using destination fuel burn at what altitude?
20000’