What S/G’s does terry turbine supply?
AFW pump 1-2?
AFW pump 1-3?
Via what valves?
TT, 1-4 (LCV-106, 107, 108, 109)
1-2, 1,2 (LCV-110, 111)
1-3, 3,4 (LCV-115, 113)
Via cross connect, each MDAFW pump can supply all for S/G’s
Auto starts for MDAFW pumps (2 & 3)?
Trips for MDAFW pumps
O.C.
Load shed
What steam traps must be in service for terry turbine to be operable?
Describe FCV-95 Auto open signal Trips
(auto starts to TDAFW)
Steam supply isolation valve to terry turbine dc powered, panel SD-12
-loss control power, ovrld relay (SI blocks ovrld relay) These Trip bkr for valve=> valve fails as is (not shut)
Describe Control scheme for TDAFW LCV’s?
MDAFW LCV’s?
TDAFW valves (ac)
MDAFW valves (ac)
What is the AFW dedicated volume in the CST?
Are units the same?
why or why not?
U-1 51%(200,000 gal)
U-2 43%(166,000 gal)
U-2 has cold head design => it will take less time to bring unit from HSBY->RHR => lesswater
Trips for TDAFW pump
Overspeed Trip throttle valve will shut (FCV-152) on mech overspeed via spring force.
Purpose of governor valve for TDAFW pump
FCV-15 maintains 4150-4200 rpm
What is power supply to TDAFW pump LCV’s? Why?
480v bus G
Each AFW pump has its own bus/train
TDAFW = G
all LCV AFW pump 2 = H
all LCV AFW pump 3 = F
Describe purpose of AFW check valve leak detection
How is minimum volume ensured on CST’s?
All suctions for loads other than AFW tap off of tank above point that ensures min vol maintained
Purpose and design of AFW