Purpose of RCS
Main- xfr heat from core to secondary
Sec- pressure boundary
- second fission product barrier
- promote nat circ
- moderate neutronsRCS design bases
Ensure every penetration has 2 auto close cap- cnmt isolation
Leakage detection capabilities(rad mon, smp lvl, cfcu)- RCS integrity
Handle +/-10 %step, 5% ramp 100-15% pwr, 95% LR- reliable plant load chgs
Location PT-405
Loop 3 hot leg
Location PT-403
Loop 4 hot leg
Location PT-403A
Loop 4 hot leg
Location PT-405A
Loop 4 hot leg
WR RCS Press inputs
PT-403/ 405
WR RCS Press inputs
PT-403A/ 405A
RCS flow xmtrs Lp 1 FT-414, 415, 416 Lp 2 FT-424, 425, 426 Lp 3 FT-434, 435, 436 Lp 4 FT-444, 445, 446
- CR ind
Delta T outputs
Tave outputs
Auctioneered delta T outputs
- RIL calc (pwr input)
Auctioneered Tave outputs
Precautions and limitations for RCS
Unit differences
Rx vessel internals differences => unit 2 higher flow rate