CVCS Letdown Flashcards

(26 cards)

1
Q

What is the purpose of the LD coils

A

Allow decay of N16 gammas

a single 2” line splits into 2x16” 12ft pipes then recombines

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the purpose of CHN-PSV-345 Intermediate LD pressure relief

A

Protects piping b/w LD and B/P control valves

-Lifts at 600 psig

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the purpose of CHN-PSV-354 low press LD relief vlv

A

Protects boronometer from over pressure

-Lifts at 200 psig

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is the purpose of CVCS

A
  • Controls RCS purity, volume, boron concentration
  • Maintains RCS chemistry, including pH
  • Continuous removal of noble gasses
  • Controls Boron to compensate for rx changes
  • Boron concentration for SDM
  • Provides Aux Spray for PZR
  • Continuous measure of RCS fission products
  • Provides RCP seal inj, and controls bleedoff
  • Source of borated water for SI
  • Source of water for refueling pool
  • SDC purification
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How long can the RWT provide SI

A

At least 20 minutes plus 10% at full flow before reaching RAS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What modification was performed to CHN-515, 516 & 523

A

Larger closing springs were installed

because of this the handwheels were removed due to the excessive force needed to operate.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What automatic features are associated with CHN-515

A

Closes on:

  • SIAS
  • Regen HX out temp HI - 413*F
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What automatic features are associated with CHN-516

A

Closes on:

  • SIAS
  • CIAS
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What automatic features are associated with CHN-523

A

Closes on:

  • CIAS
  • LD HX out temp HI - 135*F
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is the purpose of the Regen HX

A
  • Conserve RCS thermal energy
  • Minimize Thermal Shock on RCS inlet nozzle
  • Maintain LD outlet temp <450*F
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is the power supply to LD Control Valves

A

NNN-D11

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is the power supply to the LD flow control Bypass valve

A

NK

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Why is only 1 LD Control vlv in service >1000 psia

A

to prevent exceeding capacity of CHN-PSV-345

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the purpose of CHN-526 LD Flow Control Bypass vlv

A
  • 0.5 gpm flow

- Warms up Regen HX

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the purpose of the LD HX

A

continues to cool LD to <120*F to prevent damage to IX resin

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What is the power supply to the LD B/P control vlvs

17
Q

What is the purpose of the LD B/P control vlvs

A
  • controls B/P to prevent boiling in LD HX
  • Maintains around 375 psig of B/P
  • Helps control SDC flow
  • B/U temp protection - Close @ 148*F
18
Q

What is the purpose of CHN-204 Boronometer flow control vlv

A

Maintains approx. 8 gpm flow through Boronometer and rad monitor line

19
Q

What is the purpose of CHN-521

A
  • Protects the Boronometer from high temp

- Shifts at 135*F

20
Q

What type of monitor is the LD process monitor

A

General area gamma monitor

21
Q

What is the purpose of the LD rad monitor

A
  • Detects possible fuel cladding failure

- Alarm is based on 1% failed fuel

22
Q

What is the purpose of CHN-520 IX bypass vlv

A
  • Protects IX resin from high temps

- Bypasses at 135*F

23
Q

What is the concern with temp. changes and the CVCS IX’s

A
  • As LD temp goes down MORE Boron is removed

- As LD temp goes up LESS Boron is removed

24
Q

What is the max LD IX flow and why

A
  • 150 gpm

- to prevent channeling of the resin

25
How is Li created in RCS
B10 captures a neutron and then decays
26
When is the Deborating IX placed in service
- Near the end of core life | - 30-50 ppm boron