Are standby chargers normally energized?
yes
Are standby charges normally in service supplying a load?
no
What is the sequence for transferring an MCC from normal to alternate?
-Place both breakers in manual
-Close the alternate breaker
-Verify the normal breaker opens
How does the 7KV Bus Mode Selector Switch work if removing ‘B’ train main power from service?
Place 7KV Bus Mode Selector Switch in Man B and Tie and close Tie Breaker and the ‘B’ breaker will open.
PCB 20 and 21 are what train of main power?
2A
PCB 14 and 15 are what train of main power?
1B
PCB 17 and 18 are what train of main power?
1A
PCB 23 and 24 are what train of main power?
2B
When paralleling the D/G to the grid, the synchroscope must be rotating how? When do you close the D/G breaker?
-Slowly in the fast direction.
-1.5 minutes before vertical position.
Failure of which Panelboard would remove automatic makeup capability to the 1B D/G FD day tank?
1ERPD
If a loss of 1ERPD was due to inverter failure, where would it initially be powered from? What Tech Spec would be entered first?
-1VRD
-Tech Spec 3.8.9 condition B