Electrical Flashcards

(11 cards)

1
Q

Are standby chargers normally energized?

A

yes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Are standby charges normally in service supplying a load?

A

no

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the sequence for transferring an MCC from normal to alternate?

A

-Place both breakers in manual
-Close the alternate breaker
-Verify the normal breaker opens

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How does the 7KV Bus Mode Selector Switch work if removing ‘B’ train main power from service?

A

Place 7KV Bus Mode Selector Switch in Man B and Tie and close Tie Breaker and the ‘B’ breaker will open.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

PCB 20 and 21 are what train of main power?

A

2A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

PCB 14 and 15 are what train of main power?

A

1B

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

PCB 17 and 18 are what train of main power?

A

1A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

PCB 23 and 24 are what train of main power?

A

2B

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

When paralleling the D/G to the grid, the synchroscope must be rotating how? When do you close the D/G breaker?

A

-Slowly in the fast direction.
-1.5 minutes before vertical position.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Failure of which Panelboard would remove automatic makeup capability to the 1B D/G FD day tank?

A

1ERPD

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

If a loss of 1ERPD was due to inverter failure, where would it initially be powered from? What Tech Spec would be entered first?

A

-1VRD
-Tech Spec 3.8.9 condition B

How well did you know this?
1
Not at all
2
3
4
5
Perfectly