1
Q

The fuel storage and handling areas are designed to meet what major criteria?

A
  • Minimize personnel radiation exposure.
  • Maintain a coolable geometry.
  • Prevent criticality.
  • Minimize contamination of surfaces exposed to atmosphere.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The Spent Fuel Pool is designed to ensure that Keff stays below what value if fully flooded with unborated water (RN assured make-up)?

A

Keff < 1.0

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The Spent Fuel Pool is designed to ensure that Keff stays below what value if flooded with water borated to a minimum of 200 ppm?

A

Keff < 0.95

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The New Fuel Storage Vault is designed to ensure a maximum Keff of what?

A
  • Less than or equal to .95 if fully flooded with unborated water.
  • Less than or equal to .98 with area flooded with firefighting foam.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What occurs on a Trip 2 on 1EMF-15/2EMF-4 (Fuel Bridge Area Monitor)?

A

Prevents New Fuel elevator from moving in up direction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What occurs on a Trip 2 on 1EMF-17/2EMF-2 (Reactor Building Refueling Bridge Monitors)?

A
  • Sounds containment evacuation alarm if < P-6
  • Containment evacuation alarm is blocked when both source range high flux at shutdown alarms are blocked
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

(SFP & RB) The Gripper tube must be at what position to allow bridge or trolley to operate?

A
  • Full up
    or
  • Up disengaged position
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

(SFP) Bridge and trolley are electronically interlocked to limit the mast to a path of travel that prevents collision with what?

A

Spent fuel pit walls/lights.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

(SFP&RB) To enable operation of the hoist in the up or down direction, the gripper must be in which condition?

A
  • Engaged
    or
  • Disengaged
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

(SFP) To operate the gripper (Grab or Release a fuel assembly), weight indicator must read less than what?

A

1200 lbs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

(SFP&RB) Hoist will not operate in the up direction if there is an overload condition of what?

A
  • (2350 lbs West. Or 2460 lbs FCF) on weight indicator
    or
  • Mechanical overload switch open at 2700 lbs.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

(SFP&RB)Hoist will not operate in the up direction if load cell indicates greater than what and gripper is disengaged?

A

1200 lbs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

(SFP&RB) Hoist will not operate in the down direction if what condition exists (1780 lbs West. Or 1850 lbs B&W)?

A
  • Under load
    ** This interlock will not be operable within 1” of the bottom of rack or new fuel elevator. This prevents setting the full weight of one fuel assembly on top of another. There is NO indication for this condition on the SFP crane.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

(SFP) What condition will prevent the Hoist from operating in the down direction? (Less than 500 lbs. on weight indicator).

A
  • Slack cable condition
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

(SFP) What condition will prevent the East Auxiliary Hoist (2 ton) from operating in the up direction?

A
  • Overload condition. (3000 lbs)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

(SFP &RB) In what mode is the Bridge, Trolley, and fuel hoist mutually interlocked such that only one drive is operable at a time?

17
Q

(RB) To enable operation of the fuel gripper solenoid there must be indication from the load cell that a low load condition of what exists?

A

less than 500 lbs

18
Q

What two conditions will allow the Interlock Bypass Switches to be used?

A

Approved Procedure says to
or
Permission is obtained from the Refueling SRO

19
Q

What are the required actions of LCO 3.9.1 (Boron Concentration) if Boron concentration not within limit of the COLR?

A
  • Immediately Suspend CORE ALTERATIONS
    AND
  • Immediately Suspend positive reactivity additions
    AND
  • Immediately Initiate action to restore boron concentration to within limit
20
Q

What is the Bases for the required boron concentration in LCO 3.9.1 (Boron Concentration)?

A

Ensure that the keff of the core will remain less than or equal to 0.95 during the refueling operation. Hence, at least a 5% delta k/k margin of safety is established during refueling.

21
Q

What is the Basis for the great than or equal to 23 feet water level in the Refueling cavity per LCO 3.9-6 Refueling Cavity Water Level?

A

Retain iodine fission product activity in the water in the event of a fuel handling accident

22
Q

What are the required actions of LCO 3.9-6 Refueling Cavity Water Level if Refueling cavity water level not within limit?

A
  • Immediately Suspend CORE ALTERATIONS.
    AND
  • Immediately Suspend movement of irradiated fuel assemblies within containment.
23
Q

Per SLC 16.9-17 Refueling Operations - Decay Time, how long must the reactor be subcritical before movement of irradiated fuel is allowed?

A

Great than or equal to 72 hours

24
Q

What is the bases for waiting greater than or equal to 72 hours prior to moving irradiated fuel per SLC 16.9-17 Refueling Operations - Decay Time?

A

Ensures that sufficient time has elapsed to allow the radioactive decay of the short-lived fission products

25
What is the mode of applicability for SLC 16.9-21 Refueling Operations - Storage Pool Water Level?
Whenever irradiated fuel assemblies are in the storage pool