SS (WE) Flashcards

(7 cards)

1
Q

Per SLC 16.7-8 (Groundwater Level) what is the required action if the rate of rise of groundwater level is > 0.5 foot per hour for > 1 hour?

A

Be in MODE 3 within 1 hour
AND
Be in MODE 5 within 31 hours

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What occurs with the turbine building sump pumps on an Emergency High level (14’)?

A

All pumps will start regardless of their switch position

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What occurs on a trip 2 signal on EMF-31(TURBINE BUILDING SUMP MONITOR)?

A

ALL associated turbine building sump pumps secure until overridden.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Purpose of the Groundwater Drainage System (WZ) system?

A

Relieves hydrostatic pressure from the Containment Building, Auxiliary Building, and Turbine Building by discharging groundwater collected in sumps.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Which WZ sump pumps are safety related?

A

Aux A1 & B2 Sump Pumps are safety related.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Per SLC 16.7-8 (Groundwater Level) what is the required action if the Rate of rise of groundwater level is > than or equal to 0.3 foot per hour?

A

————–NOTE————-
Required to be performed when groundwater level
reaches the top of floor slab.
————————————
- Determine rate of rise of groundwater level Once per 30 minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Per SLC 16.11-5 (Chemical Treatment Ponds), what is the required action if the Quantity of radioactive material in any CTP (Chemical Treatment Pond) is exceeding the limits?

A

Immediately Suspend all additions of radioactive material to the CTP.
AND
Immediately Initiate corrective action to reduce the CTP contents to within limits.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly