The Pressurizer Pressure control system is designed to provide satisfactory operations without a Reactor trip during what load transients?
-Loading or unloading at 5% of full power per minute
-Step load change of +/- 10% with automatic rod control
-Step load reduction of 95% of full power with automatic rod control and steam dump operation.
Which Selected Pressurizer Pressure channel blocks PZR PORV (NC-32B & NC-36B) at 2177 psig.
Selected Pressurizer Pressure - 1
What is total core bypass flow? Where Does it go?
7.5%
-Head Cooling 4%
-Control Rod and Instrument Thimble 2%
-Nozzle flow 1%
-Baffle flow .5%
How many NR T-Hot thermowells? Why?
3 per loop
Located in Hot Leg (laminar flow)
How many NR T-Cold thermowells? Why?
1 per loop
Located at the discharge of the NCP (turbulent flow)
How is flow provided through the PZR?
By D/P across the core and the spray line suctions
PZR Purpose
Provide a point in the NCS where liquid and vapor is maintained saturated to provide pressure control and accommodate positive and negative surges caused by load transients
**Overpressure control
How many PZR PORVs?
3
NC-32B, 34A and 36B
Air operated
Each with an associated block valve
How many PZR Safeties and their setpoint?
3
NC-1,2 and 3
set at 2485#
PZR PORV Power Supplies
NC-34A EPA
NC-32B EDF
NC-36B EDF
How is Loop Flow Sensed?
-3 d/p transmitter connected across the elbow of the crossover piping
-Share a common penetration on outside elbow (HP side)
-Each transmitter has its own penetration on the inside elbow (LP side)
-Flow increase = d/p increase
-System design flow = 101,000gpm per NCP
What is Hot Zero Power Specs (Both Units)?
Pressure - 2235#
PZR Temp - 653F
Loop Th - 557F
Loop Tc - 557F
Tavg - 557F
What is Hot Full Power Specs (Unit 1)?
Pressure - 2235#
PZR Temp - 653F
Loop Th - 615.9F
Loop Tc - 554.3F
Tavg - 585.1F
What is Hot Full Power Specs (Unit 2)?
Pressure - 2235#
PZR Temp - 653F
Loop Th - 616.7F
Loop Tc - 558.3F
Tavg - 587.5F
What is PZR Insurge?
-PZR Temp > NCS Temp
-Charging increased or loops heat up then cold water will surge into PZR
-Could lead to severe stratification of the lower head
-Potential for high stress when hot metal is cooled rapidly
-Counteracted by outsurge (use of heaters and spray)
Why is there a .5gpm bypass flow around spray line?
Reduce thermal stress on spray piping and nozzle
What temperature differential between PZR and spray fluid shall spray flow not be used?
> 320F
What is PZR Outsurge?
-Occurs when NCS coolant temps lower
-Steam volume expands causing pressure to start to lower
-Flashing of water to steam limits the pressure drop
How is NC-34A PORV Operated? What is its setpoints?
-Operated automatically by PZR pressure Master
-Lifts 100# above pressure setpoint and recloses at 80# above setpoint
-Manual Operation on MCB and ASP-A
-Auto controls blocked when transferred to ASP
NC-32B and NC-36B Setpoints
-Lift at 2335# and reclose at 2327#
-Manual operation from MCB and ASP-B
-Auto controls blocked when transferred to ASP
At what pressure are all PORVs Blocked?
2177#
**Manual control still available
How do you isolate a PORV using its block valve?
Place the block valve switch into the close position
**Interlocked that only first valve placed in “close” will close (Remaining valves must be placed in “override: to close)
When is LTOP used? Why?
<300F (and “Low Press” selected)
Brittle Fracture
What PORVS are used during LTOP and what are setpoints?
NC-34A and 32B
400#