What is the purpose of the KF (Catawba Spent Fuel Pool Cooling System)?
Designed to remove heat from the Spent Fuel Pool and maintain purity and optical clarity of the pool water during fuel handling operations.
What is the mode of Applicability for LCO 3.7.14 Spent Fuel Pool Water Level?
During movement of irradiated fuel assemblies in the spent fuel pool.
What SFP level is required per LCO 3.7.14 Spent Fuel Pool Water Level?
Greater than or equal to 23 ft (37.6 ft on 1KFP5120) over the top of irradiated fuel assemblies seated in the storage racks.
Where can the Spent Fuel Pool level be made-up from?
-YM (unborated water source)
-RMWST (Reactor Makeup Water Storage Tank)(unborated water source)
-RHT (Recycle Hold Up tank)(borated water source with a varying concentration)
-FWST (borated water source)
-RN system (unborated water source) is assured makeup supply
How many gallons of water per foot are in the SFP?
17,000 gallons of water per foot of level.
What are the bases for the great than 23 feet requirement of LCO 3.7.14 Spent Fuel Pool Water Level?
-Meets the assumptions of iodine decontamination factors following a fuel handling accident.
-Shields and minimizes the general area dose when
the storage racks are filled to their maximum capacity.
-Provides shielding during the movement of spent fuel.
Are the KF pumps automatically started by the sequencer following a blackout?
No, they get a permissive to start from load group 13, must be manually started.
What signals will close KF-101B and KF-103A (FWST to SPENT FUEL POOL)?
-Ss signal
-When control is shifted to the associated Auxiliary S/D panels
What occurs on a trip 2 signal on the Spent Fuel Building Refueling Bridge Monitors (1EMF-15 and 2EMF-4)?
Automatically stop the new fuel elevator from being raised
What two signals would require securing the KF Pumps to prevent pump motor overheating?
-Sp
-An Ss coincident with a Lo FWST signal
Per limits and precautions of OP/1/A/6200/005 (Spent Fuel Cooling System), what is the maximum flow through purification loop with only 1 pre-filter or post filter in service?
265 gpm
Per limits and precautions of OP/1/A/6200/005 (Spent Fuel Cooling System), what is the maximum flow through purification loop with 2 pre-filters and 2 post filter in service?
530 gpm
Per limits and precautions of OP/1/A/6200/005 (Spent Fuel Cooling System), what is the maximum fuel pool temperature for operating the purification system with the demineralizer in service?
125 degrees F
Per limits and precautions of OP/1/A/6200/005 (Spent Fuel Cooling System), The maximum fuel pool temperature for operating the purification system with the KF System filters in service?
180 degrees F
Per limits and precautions of OP/1/A/6200/005 (Spent Fuel Cooling System), The maximum fuel pool temperature for operating the skimmer loop?
200 degrees F
Per limits and precautions of OP/1/A/6200/005 (Spent Fuel Cooling System), At what fuel pool temperature is the SSF non-functional?
Greater than or equal to 125 degrees F
What is required actions for LCO 3.7.14 (Spent Fuel Pool Water Level) if spent fuel pool water level is not within limit?
Immediately Suspend movement of irradiated fuel assemblies in the spent fuel pool.
————-NOTE————–
LCO 3.0.3 is not applicable.
What is required actions for LCO 3.7.15 (Spent Fuel Pool Boron Concentration) if Spent fuel pool boron concentration not within limit?
-Immediately suspend movement of fuel assemblies in the spent fuel pool
AND
-Immediately initiate action to restore spent fuel pool boron concentration to within limit
————-NOTE————–
LCO 3.0.3 is not applicable.
What is required actions for LCO 3.7.16 (Spent Fuel Assembly Storage) if Requirements of the LCO not met.?
Immediately Initiate action to move the noncomplying fuel assembly to the correct location.
————–NOTE————-
LCO 3.0.3 is not applicable.
Per SLC 16.7-17 Spent Fuel Pool (SFP) Wide Range (WR) Level Instrumentation, how many SFP WR Level Instrumentation channels shall be FUNCITONAL and when?
2 Whenever irradiated fuel assemblies are stored in the SFP.
What is required actions for SLC 16.9-21 Refueling Operations - Storage Pool Water Level) if less than 23 ft of water in the SFP?
-Immediately suspend all movement of fuel assemblies and crane operations with loads in the fuel storage area.
AND
-With in 4 hours restore water level to within limit.
Per SLC 16.9-21 Refueling Operations - Storage Pool Water Level), what is the bases for the minimum water level of 23 feet?
Ensure that sufficient water depth is available to remove 99% of the assumed 10% iodine gap activity released from the rupture of an irradiated fuel assembly