What is the function of the CSS?
What is the left train CSS?
Left Train Containment Cooling?
Left Train Containment Spray
Left Train Containment Cooling
What is the right train CSS?
Right Train containment cooling?
Right Train Containment Spray
Right Train Containment Cooling
Describe the design of a CS pump.
Vertically split, horizontal centrifugal pumps with mechanical seals and auxiliary gland.
2300v, 250 hp, 55 amps at full load.
Describe the harsh environment features up the CS pumps.
What are the CS throttle valves?
CV-3001/3002
What is the control and throttle power for CV-3001?
Closing: D-11-1 and D-21-1 Opening and Throttling D-11-1
What is the control and throttle power for CV-3002?
Closing, Opening, and Throttling D-21-1
What “arms” a containment spray pump?
SIAS
When do the CS throttle valves throttle and why?
On RAS at 2% in SIRW tank to reduce NPSH requirements of CS pumps.
What is RAS and its logic?
Switch from SIRW to Sump on 24” (2%) in SIRW.
1 out of 2 taken twice.
Left Channel LS powered via Y-10 (327) and Y-20 (328)
Right Channel LS powered via Y-30 (329) and Y-40 (330)
Describe the containment sump.
22 feet in diameter, seven 4-inch floor drains, five 16-inch inlets, one 24-inch inlet and two 24-inch outlets to ECCS (CS & HPSI) pumps. One 4-inch outlet to radwaste.
Only two of the five 16-inch inlets, attached to passive strainers, are credited flow paths.
What are the passive strainers and what is unique in terms of flow path?
Installed on two of the 16-inch inlets and allow passage of no larger than 0.095 inch particles while meeting NPSH requirements.
They are the only post LOCA credited flowpath.
What is NaTB?
Sodium Tetraborate Decahydrate. Apprx 9k lbs in strainer baskets. Keeps ph >7 post RAS to maintain iodine captured via spray system.
What is the normal flow path of the CS system?
Not in service. Pump suction/discharge locked open, mini-flow locked closed, CV-3001/3002 spray control valves closed.
PRV-3001/3002 setpoint?
95 psig +/- 5 psig
What opens CV-3071, P-66A Subcooling?
P-66A running and RAS signal.
What opens CV-3070, P-66B Subcooling?
P-66B running and CV-3030 open
What happens if CV-3030 does not open?
RAS closes CV-3001 after a 30-second time delay.
What happens on CHP?
P-54A/B start, CV-3001/3002 open provided SIAS present.
P-54C will start 20-seconds later.
White light on pump controls indicate they have SIAS signal and are waiting on CHP.
What is the left-train RAS signal?
Y-10 and Y-20 powering LS-0327/0328.
What is right-train RAS signal?
Y-30 and Y-40 power LS-0329/0330.
What happens on RAS?
How is CS lined up to fill SI tanks?